Loading...
Copperstone/FP-DR 950831 (4)SENT BY:TU FAR~RS BRANCH : 8-31-05 : 13:22 : TU FARMERS BRANCH~ 214 304 3570:~ 0/10 Comments for the City of Coppell Development Review Committee [/~mell.,inary/Final Plat is "'% acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (~ize of structure, A/C / Hea~ Load) will be required from the developer before easements can be determined. Otheroomments Please call me at g14-888-1307 if you have any questions. Tim Brancheau 14400 J(]Ky lan(: FmTletS Branch. Texas 7~234