Copperstone/FP-DR 950831 (4)SENT BY:TU FAR~RS BRANCH : 8-31-05 : 13:22 : TU FARMERS BRANCH~ 214 304 3570:~ 0/10
Comments for the City of Coppell
Development Review Committee
[/~mell.,inary/Final Plat is "'% acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (~ize of structure, A/C / Hea~ Load) will
be required from the developer before easements can be
determined.
Otheroomments
Please call me at g14-888-1307 if you have any questions.
Tim Brancheau
14400 J(]Ky lan(: FmTletS Branch. Texas 7~234