Loading...
Coppell Rd BP/FP-CS 870414April 14, 1987 MEMORANDUM TO: Alan D. Ratliff, City Manager FROM: Steve Goram, Director of Public Works RE: Coppell Road Business Park Fee Assessments In speaking with the City Engineer, we have calculated the following fees associated with the above referenced project. 1. Plat fee $296.28~ 2. Water/Wastewater availability fee $6,759.24. This figure is based on $120.00 per 1000 sq. feet. 50% of the above fee shall be paid prior to approval of the final plat by the City Council. The remaining 50% shall be paid prior to issuance of any building permit for the developed development. Water Tap Inspections $100.00. 4. Sewer Tap Inspections $100.00. Total: $7,255.52 SGG/bb cc: Wayne Ginn, Consulting Engineer