Loading...
Freeport-4.1/PP-AG000912F COPPELL AGENDA REQUEST FORM CITY COUNCIL MEETING: September 12, 2000 ITEM # __~ ITEM CAPTION: Consider approval of the Duke-Freeport Addition, Lot 1 of Block A, Lot 2 of Block B and Lot 3 of Block C, Preliminary Plat, to allow the construction of Freeport Parkway and the development of office/warehouse facilities on approximately 144 acres of property along the north side of W. Bethel Road, south of Ruby Road, and west of Coppell Road. APPROVED BY : ITY COUNCIl.. SUBMITTED ~. Sie~~b L~,t4~= TITLFi(. Director of Pla~ia~g and Community Services H/~ ~ STAFF CO~ Date of P&Z Meeting: August 17, 2000 .Decision of P&Z Commission: Approved (6-0) with Commissioners Nesbit, Kittrell, McCaffrey, Clark, Halsey and Stewart voting in favor. None opposed. Approval is recommended, with the following conditions: ) All utilities associated with the construction of Freeport Parkway; i.e., drainage easement which will run west to east through the property, need to be platted. O Existing right-of-way of Bethel Road needs to be shown. Right-of-way dedication will be needed to accomplish the 90' right-of-way needed for Bethel Road. ~ Existing right-of-way for Ruby to Right-of-way may Road needs be shown. dedication be needed to achieve the 60' right-of-way requirement. Q TXU need be shown. Please contact Rick Fielding at (972) 888-1344. easements to Staff recommends approval. DIR. INITIALS: ~, FIN. REVIEW:C~~( CITY MANAGER REVIEW: ~k~~1 Agenda Request Form - Revised 5/00 Document Name: ~DukFpp '~ CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: DUKE-FREEPORT ADDITION~ LOT 1 OF BLOCK A~ LOT 2 OF BLOCK B AND LOT 3 OF BLOCK C PRELIMINARY PLAT P & Z HEARING DATE: August 17, 2000 C.C. HEARING DATE: September 12, 2000 LOCATION: Along the north side of W. Bethel Road, south of Ruby Road and west of Coppell Road. SIZE OF AREA: Approximately 144 acres of property (of which 10.083 acres is to be platted as Freeport Parkway r.o.w.) CURRENT ZONING: LI (Light Industrial) REQUEST: Preliminary Plat approval. APPLICANT: Duke-Weeks Realty Pacheco-Koch Engineers 5495 Beltline Road 9401 LBJ Freeway Suite 360 Suite 300 Dallas, Texas 75240 Dallas, Texas 75243 (972) 361-6700 (972) 235-3031 Fax: (972) 361-6800 Fax: (972) 235-9544 HISTORY: There has been no recent development history on this 140 acre plus parcel although a zoning case to rezone to PD was approved by the Planning Commission on April 20, 2000. That recommendation was not forwarded to City Council at the request of the applicant. ATTACHED TO C.C. PACKET Item # 11 _ qT/~ ~Lg0 TRANSPORTATION: Freeport Parkway is shown as a C4D/6 four lane divided thoroughfare, to be contained within a 110 foot right of way. It currently does not extend through this property, hence the reason for the plat. SURROUNDING LAND USE & ZONING: North- vacant and developing duplexes; LI and 2F9 South - warehousing; LI East - residences and commercial; SF-12, PD SF-7, HO-C West - vacant; LI COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for light industrial uses. DISCUSSION: This proposal is primarily for the dedication of right-of-way for the extension of Freeport Parkway through the Duke-Weeks property. In toto, approximately 10 acres of land are shown to be dedicated for this roadway. With a r.o.w, width of 110 feet there will be ample room for utilities, pavement, etc. required by ordinance. A secondary commem relates to the ultimate development of this land once the street has been platted. Planning Commission approved rezoning this parcel from LI to PD in April. Subsequent to that action, the applicant requested a delay in forwarding the PD recommendation to Council. Provided the applicant understands that a final plat for any building site can not be processed until permanent zoning has been established, staff can support this submittal. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: As outlined above, provided the applicant is platting this property for the purpose of dedicating the right-of-way for the extension and construction of Freeport Parkway, staff can support the request. However, if the purpose of the plat is to establish building sites for construction, there are a number of additional processes the applicant must go through before the plat is ready for approval. For example, the property has been approved for PD zoning by the Planning Commission. Before any development could occur on site, the PD would have to be considered by City Council. Assuming rezoning is eventually approved, then minimum setbacks, fire lanes, landscape requirements, site plan approval wood all have to be considered before any development could occur. ATTACHED TO C.C. PACKET ALTERNATIVES: 1) Recommend approval of the request 2) Recommend disapproval of the request ATTACHMENTS: 1) Departmental comments (Engineering) 2) Departmental comments (TXU) 3) Conditions for approval of the PD 4) Preliminary Plat Document ATTACHED TO C.C. PACKET Item # 11 ~ffJ DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke-Weeks Realt~ Corporation, Preliminarl~ Plat, to allow the construction of Freeport Parkway and the development of office/warehouse facilities on approximately 142 acres of property along the north side of W. Bethel Road, south of Ruby Road, and west of Coppell Road, at the request of Pacheco Koch Consulting Engineers. DRC DATE: July 27, 2000 and August 3, 2000 CONTACT: Mike Martin, P.E., ~4ssistant City Engineer (972-304-3679) COMMENT STATUS: PP..EL!?,!Fs~ !~a~v.Y ,,,'FINAL ~ 1. Need to plat all utilities associated with the construction of Freeport Parkway (i.e. drainage easement which will mn west to east through property). 2. Need to show existing right-of-way of Bethel Road. Right-of-way dedication will be needed to accomplish the 90' right-of-way needed for Bethel Road. 3. Need to show the existing right-of-way for Ruby Road. Right-of-way dedication may be needed to achieve the 60' right-of-way requirement. ATTACHED TO C.C. PACKET TXU TXU Electric & Gas 4200 North Belt Line Irving, TX 75038 Comments for City of Coppell Development Review Committee July 26, 2000 Duke-Weeks Realty Corporation, Final Plat Easements needed. Contact Rick Fielding at 972- 888-1344. Bobby Oney ATTACHED TO C.C. PACKET