Denton Tap1P/FP-DR 970828 (6)Date
' ' ELECTRIC
Comments for the City of Coppell
Development Review Committee
~/Final Plat for "~,'~'"~)~"-J '~
/
%? Rre]~-~r~Final Plat is not acceptable.
JEasements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
V/Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments
?
Please call me at 2~4-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234