DFW Trade ROW-DR 950831 (6)SENT BY:TU FARMERS BRANCH : 8-31-95 : 13:23 : T[ FARMERS BRANCH~ 214 304 3§70;#10/10
Comments for the City of Coppell
Development Review Committee
.~'~roliminaYy/Final Plat is~W~acceptable.
Easements will De required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (~ize of structure, A/C / Meat Load) will
be required from the developer before easements can be
determined.
Other comments
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400]o;cyf...mtc FarrncrsBranch, Te~a~ 75~34