Denton Tap1P/PP-DR 970626 (6) I I
"~I~ELECTRIC
JUN ~_ 7 19~7 ~,i
IL.WI
I
Date
l/Preliminary/F~ Plat is ~ acceptable.
Comments for the City of Coppell
Development Review Committee
Preliminary/F-i~4 Plat for ~~
L//Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
~//Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Othercomments
Please call me at/f~-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234