Loading...
Denton Tap1P/PP-DR 970626 (6) I I "~I~ELECTRIC JUN ~_ 7 19~7 ~,i IL.WI I Date l/Preliminary/F~ Plat is ~ acceptable. Comments for the City of Coppell Development Review Committee Preliminary/F-i~4 Plat for ~~ L//Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. ~//Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Othercomments Please call me at/f~-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234