Loading...
Deer Run/PP-DR 980326 (5) I I "IIIELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/li~ Plat for Date ~//Prelimin~ Plat is"n~acceptable. ~Easements will be required for proposed electric/gas facilities. A plat with e~ement requirements will be provided to the developer. ~Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. Other comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 J'osey Lane Farmers Branch, Texas 75234