Deer Run/PP-DR 980326 (5) I I
"IIIELECTRIC
Comments for the City of Coppell
Development Review Committee
Preliminary/li~ Plat for
Date
~//Prelimin~ Plat is"n~acceptable.
~Easements will be required for proposed electric/gas facilities. A plat with
e~ement requirements will be provided to the developer.
~Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 J'osey Lane Farmers Branch, Texas 75234