Eckerd/PP,SPRv-DR 980528 (6)TUELECTRIC
Development Review Committee
Preliminary/Fiw~ Plat for
Date 5-28-98
'L//Preliminary/EIl~ Plat is ~ acceptable.
L//Easements will be required for proposed electric/gas facilities. A plat with
easement requirements will be provided to the developer.
Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
'¢ Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234