Loading...
Fairways/Re-DR 950427 (2) COMMIT~~ DEVELOPMENT REVIEW  IM~ 2 T ;~ ; ENGINEERING COMMENTS I~M: ~e F~s ~ ~ve~e. gep~ of ~ts 3~58. 3~ A. to ~,g~ .......... the ~c~n of the l~ye~ ~ ~~ on ~ 30 though 58, B~k A ~ed ~ng the ~h ~ of ~g~i!! Cou~ ~ Be~h~ ~e, ~ ~e ~que~ of N~ D. M~er Consu~g En~ee~, Inc. DRC DATE: ~ 27, 1~5 ~ M~ 4, 1995 CONTACT: Ken G~ffin, P.E., Assistant Ci~ Manager/Ci~ Engineer (304-3679) INITIAL PqtELIMINARY FINAL Platting Comments: 1. It is confusing as to what the floodplain limit is doing adjacent to lots 49R, 50R and 51R. Please clariS,. 2. Please explain why the floodplain line is being changed.