Fairways/Re-DR 950427 (2) COMMIT~~
DEVELOPMENT REVIEW
IM~ 2 T ;~ ;
ENGINEERING COMMENTS
I~M: ~e F~s ~ ~ve~e. gep~ of ~ts 3~58. 3~ A. to ~,g~ ..........
the ~c~n of the l~ye~ ~ ~~ on ~ 30 though 58,
B~k A ~ed ~ng the ~h ~ of ~g~i!! Cou~ ~ Be~h~
~e, ~ ~e ~que~ of N~ D. M~er Consu~g En~ee~, Inc.
DRC DATE: ~ 27, 1~5 ~ M~ 4, 1995
CONTACT: Ken G~ffin, P.E., Assistant Ci~ Manager/Ci~ Engineer (304-3679)
INITIAL PqtELIMINARY FINAL
Platting Comments:
1. It is confusing as to what the floodplain limit is doing adjacent to lots 49R, 50R and 51R.
Please clariS,.
2. Please explain why the floodplain line is being changed.