Loading...
Enclaves/PP-DR 980326 (3)'I~ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/F-i~ Plat for Date ~/Preliminary~ Plat is q,~ acceptable. ~Easements will be required for proposed electric/gas facilities. A plat with e~sement requirements will be provided to the developer. .4//Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. Other comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234