Essex Wire/FP-CS 861104P. O. Box 478
Coppell, Texas 7501g
214 - 462 · 0022
November 4, 1986
Mr. Bill Foose
Connell Development Company
P. O. Box 201069
Dallas, Texas 75220
RE: Essex Wire Addition
Dear Bill:
Attached are the comments made at the Development Review Committee
meeting on November 6, 1986. Please make the addressed changes and
submit twenty-two (22) sets of Final Plat, Final Site Plan,
Streetscape/Landscaping Plan and three (3) sets of Engineering Plans, no
later than 10:00 a.m. on Honday, November 10, 1986.
If we can be of any help, please do not hesitate to call.
Sincerely,
·
Shohre Daneshman~---'
Civil Engineer
cc: File
SD/lsg
1",'~5[~~',. ..,
Page. I
Final Plat submittal shall include: 1) Final Plat
2) Final Site Plan
Civil Engineering Plans (approved)
4) Cost Estimate for all improvements (Development Fees)
6)
Streetacape and Haintenanca Agreement for Landscaping. (See
attached Exhibit "A", Ovner's Agreement from Streetscnpe Plan)
Landscaping Plan
DRC CO~h~ENTS
Final Plat:
a)
b)
e)
d)
e)
f)
Provide a space and wording for 'Planning and Zoning Chairman
Signature of Lone Star Gas Company on the Final Plat
Lot number and Block number to be assigned by Connell
Development Company and the subdivision's name.
Show all the building set-backs according to the Zoning
Ordinance.
Volume and page number of the existing easements.
Remove all information pertaining, to development, utility
lines and contours.
Site Plan: (Specify Final Site Plan)
1) Water improvements:
a) Existing and proposed lines including valves, F.H.'a and
meter volts. '.
b) Overall Drainage Area Hap (You can attach the drainage
area map of Northlake 635 Business Park) with the site
shown on that map (exact location).
c) How much water will ba produced at drive ~pproaching from
roofdrains plus oh and off-site developmentI calculate
velocity (FPS) of the flor at drivevays).
d) ~l~at amount of water ie contributed to the grate inlet on
the northeast corner of.the property, where is it being
discharged and what is the capacity of that inlet.'
General Information:
a)
b)
c)
f)
No Parking within five (5) feet of the property line
Specify utility easement at the rear end of the lot.
Packing lot must have a 6 (six} inch lime stabi!tzed subgrade,
a,~d no cu~hJor, sand.
Size of the building itl Sq. Ft. or Ac'.
!~r~ve approach r:ust end within the prcl.~r~v I.ei,i: pl.~tted,
should not extend in front of the adjacent property.
Minimum distance between sanitary and water servi¢.~ line
be ten (10) feat.
Pa~e 2
Streetscape/Landscaping Plan:
a) Furnish a separate streetscape/landscape plan sealed by a
landscape architect, including a irrigation plan sealed by
registered landscape irrigator.
b) Hust provide an owner!s agreement to the City for landscape
.maintenance as per Streetscape Ordinance.
Civil Development Plan:
a) A separate set of engineering plans covering all improvements
within City R.O.W. and parking lot. These plans should
include all applicable details normally designed by registered
professional Engineer. They should include parking lot, drive
approaches, drainage systems, water and sanitary services,
etc.
b) Engineering plans should be sea%ed by Registered Civil
Engineer and should include City'standard details.
Development Fees:
a)
b)
Must provide cost of total development for improvements within
City R.O.W., dedicated easements parking lots.
All development fees must be paid before final plat will be
submitted to the City Council for consideration. Development
fees'will be computed by Director of Public Works.
Minutes of November 6, 1986
DEVELOPMENT REVIEW COMMITTEE
The Development Review Committee met at 8:30 a.m. on Tuesday, November
4, 1986 at the CoppeI1 Town Center. The following members were present~
Ed Powell, City Engineer
Taryon Bowman, Sr. Planning Technician
Shohre Daneshman, Civil Engineer
Steve Morton, Chief Development Inspector
Troy Glidewell, Fire Marshal
Dale Jackson, Building Official
Steve Goram, Director of Public Works
Linda Glidewell, Secretary
Gabe Favre, Ginn, Inc.
Richard Milner, Coppell Cablevision
Jerry Davis, General Telephone
Tim Branchau, Texas Power and Light
Glen Fabian, Texas Power and Light
Fred Harris, Lone Star Gas
Doug Jones, Lone Star Ga8
The following items were reviewed by the Committee:
Page 2
Essex Wire Addition: Final Plat
COMMENTS:
Shohre Daneshmand - Engineering:
(1) No space for Planning and Zoning Chairman to sign plat.
(2) Lone Star Gas has not signed plat.
(3) Existing & proposed utilities should be designated.
(4) Need to show size of building.
(5) Roof drainage, off-site and on-site drainage.
(6) Minimum distance between utility service lanes.
(7) Need detail on driveway approach.
(8) Building line set-back is not clear.
(9) See attached letter.
Troy Glidewell - Fire Marshal:
(I) No fire lanes shown on site plan.
Dale Jackson - Building Official: (1) Need to specify size of building.
(2) Need to specify estimated occupancy, so number of needed
parking spaces can be assessed.
Steve Morton - Chief Development Inspector: (1) Problem With floor elevation and street contour.
(2) Need to specify what they are going to do with irrigation.
(3) Need to remove cushion sand under concrete.
Steve Goram - Public Works: "
(1) Utilities need to be more defined.
(2) Water service off of fire hydrant lead will be a problem.
(3) They need to furnish a landscape plan and maintenance
agreement.
Texas Power and Light: (1) No comments.
(2) For detailed guidance or further information please contact
the appropriate representative.
~err¥ Davis - General Telephone: (I) No rear easement shown for GTE.
(2) All utility easements should be designated as such and not
specified as to which utility company.
Richard Milner - Coppell Cablevision:
(I) All utility easements should be designated as such and not
specified as to which utility company.
Gabe Favre - Ginn, Inc.: (1) Provide details as to concrete strength, design mix, etc.
(2) Radius at south property line at Crestside needs to be located
within the property line. ~
(3) Minimum parking stall width shall be 9' 0". // /f ~
(4) Indicate fire lanes on plan.
Pa~e 3
(5) May need to provide additional fire hydrant on east side of
property. Check with Fire Marshal.
(6) Provide double clean-out at property line for sanitary sewer.
(7) Provide meter valut as per City Standards (for water line).
(8) Rework grading plan along Crestside Drive to con£orm to
landscape berms, grading, etc.
(9) No parking is allowed within thirty feet of the front property ·
line or within five feet of the rear property line. This plan
violates both regulations.
(10) Indicate floor to area ration (F.A.R.) on plans.
GENERAL COHHENTS:
(1) Must provide cost of total development for improvements within
City R.O,W., dedicated easements ~rking lots..
(2) All development' fees must be paid before final plat will be
submitted to the City Council for consideration. Development
fees will be computed by the Director of Public Works.
(3) Provide Landscape Maintenance (see attached Homeowners
Agreement).