Loading...
First United P2/MP-DR 980226(6) I/ II,ELECTRIC Comments for the City of Coppell Development Review Committee re ..... ln..,s,,.,,,~, · ,,,, for __Preliminary/Final Plat is not acceptable. V/Easements will be required for proposed electric/gas facilities. A plat with easement requirements will be provided to the developer. V/Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. ////Other comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234