Loading...
First United P2/Re-DR 981029(3)--'-_ L--d TUElectric Texa~ Utllltl®~ Comp.nle~ Comments for the City of Coppell Development Review Committee First United Methodist Church of Coppell, Replat of Lot 1, Block 1 October 29, 1998 X X X X Replat is not acceptable. Easements will be required for proposed electric/gas facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C, heat load) will be required fi.om the developer before easements can be determined. Other comments Please contact Jeff Curry at 972-570-4126 to discuss loads and easements. Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234