Loading...
First United P2/Re-AG010508'~T H ~'E CI TY 0F' COPP-ELL AGENDA REQUEST FORM CITY COUNCIL MEETING: May 8, 2001 ITEM # 4 8 . ITEM CAPTION: PUBLIC HEARING: Consider approval of First United Methodist Church, Section Two, Replat, to allow a revision to the west parking lot on approximately 7.039 acres of property located at the northwest comer of Bethel School Road and Heartz Road. SUBMITTED .'~~G~y L~ TITLE: ]glir~tor of Pl~llllillg_,xu0~ommuni~ Services STAFF COMMENTS: APPROVED BY CITY COUNCIL DATE ,, .6'- ~-~/ Date of P&Z Meeting: April 19, 2001 Decision of P&Z Commission: Approved (6-0) with McCaffrey, Clark, and Halsey voting in favor. None opposed. Commissioners Nesbit, McGahey, Kittrell, Approval is recommended subject to the following condition: (CONDITION MET) Staff recommends approval. DIR. INITIALS: ~ FIN. REVIEW.~ Agenda Request Form - Revised 5/00 CITY MANAGER Document Name: @FUMC CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT REPLAT OF FIRST UNITED METHODIST CHURCH ADDITION SECTION 2, LOT 1 BLOCK 1 P & Z HEARING DATE: C.C. HEARING DATE: April 19, 2001 May 8, 2001 LOCATION: SIZE OF AREA: CURRENT ZONING: REQUEST: APPLICANT: ttISTORY: TRANSPORTATION: Northwest comer of Bethel School Road and Heartz Road Approximately 7.04 acres of land SF-7, S-1137 Replat to allow for the relocation of the fire lane. Owner: First United Methodist Church 420 South Heartz Road Coppell, Texas 75019 972- 462-0471 FAX: 972-393-1260 Engineer: William Anderson Dowdy, Anderson & Assoc. 5225 Village Creek Drive Suite 200 Plano, Texas 75093 972-93 ! 43694 FAX: 972-931-9538 In 1984, a five acre tract was platted to allow for the initial construction of the First United Methodist Church facility at the northeast comer of Bethel School and Heartz Road. In April 1998, a Minor Plat was approved on 7.04 acres of land (Section 2) to allow for the construction of this parking lot. Finally, the replat for the main facility was approved in 1998, but not filed until July of 1999. City Council granted an extension for the filing of this replat. Bethel School Road is shown on the Thoroughfare Plan as a C2U, two-lane undivided collector street within a 60 foot wide right-of- Item # 7 way, built to standard east of Heartz Road and substandard in pavement width west of Heartz. Heartz Road is shown on the thoroughfare plan as a C2U, two-lane undivided collector built to standard, but within a substandard right-of-way width of 50 feet (60 feet is standard) SURROUNDING LAND USE & ZONING: North-Single Family residential; SF-12 (Frank Addition) (Willowood and Braewood West) South-Single Family residential; SF-12, SF-9 and 2F-9 Woodlands) East - Single Family residential; SF-12, (Northlake Woodlands) West - Day Care Center and undeveloped; "C" Commercial and SF-7 (Northlake COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for institutional and medium density residential uses. DISCUSSION: As discussed in the HISTORY section of this report, this property was originally platted in April, 1998 to allow for the construction of the parking lot. That Minor Plat established a fire lane and the setback lines. The requested Replat will abandon the previous fire lane, and establish a new fire lane configuration to serve the redesigned parking lot. Further, this plat designates sidewalk easements along all streets. At the northeast corner of the tract, this sidewalk easement widens to 15 feet to accommodate the meandering portion of the sidewalk. The remaining sidewalk will be within a 5-foot easement. However, this easement needs to be more clearly labeled. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of the Replat of First United Methodist Church Addition, Section 2, Lot 1 Block 1, subject to the following condition: 1. Clearly label the sidewalk easements. ALTERNATIVES: 1) 2) 3) 4) Recommend approval of the request. Recommend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) Department Comments: Fire Administration and TXU Electric and Gas Replat of First United Methodist Church Addition, Section 2, Lot 1 Block 1 Item # 7 DE VEL OPMENT RE VIE W COMMITTEE FIRE PRE VENTION COMMENTS ITEM: FIRST UNITED METHODIST CHURCH, SECTION TWO, REPLAT DRC DA TE: MARCH 29, 2001 CONTACT: TRAV~S CRUMP, FIRE MARSHAL. (972) 304-3503 COMMENT STATUS: I PRELIMINARY CAUTIONARY NOTE: While the furore building is not included in this review, it should be noted that S. Heartz and Vanbebber Roads can not be utilized as fire lanes. This will adversely affect the footprint of the future site. An on-site fire lane will be required on the North and East sides of th~ building. 2. Plat all fire lanes as easements. TXU Electric & Gas 4200 North Belt Line Irvin~ TX 75038 Comments for City of Coppell Development Review Committee March 29, 2001 S ! 173-R, First United Methodist Church, Section Two Zoning change acceptable Replat · acceptable, but additional easements may be needed if building is built on the site in future. Bobby Oney MAR 2 9 2001