Loading...
Four Seasons/FP-CS 901107GINN, INC. CONSULTING ENGINEERS November 7, 1990 Ms. Shohre Daneshmand, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Four Seasons Addition Construction Plans Dear Ms. Daneshmand: We have reviewed the above referenced plans for general conformance to the City of Coppell ordinances and standards. The following sets forth our comments. e 10. 11. We have no objections to the final plat as presented. Provide 8" waterline in lieu of 6" as shown. Provide 8" waterline from Thweatt Road, south, to tie to proposed line along eastern property line. Provide details of pavement. Provide details of fire lane construction, especially along north side of building. Add fire lane to parking area along west side of building. Show additional dimensional control for parking, paving, etc. Provide landscape plan per city standards. Provide escrow in amount of $200.00 per front foot for future Sandy Lake Road (Thweatt) improvements. In lieu of flowlines of storm sewer matching, we would recommend that top of pipes match. It appears that all other items on mark-ups have been addressed. You may want to have staff review their comments again. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Other than the above stated items, we have no further objections to the plans as submitted. Should you have any questions or need additional information, please contact our office. Sincerely, Gabe Favre GF/dsp cc: Steve Goram Taryon Bowman Pacheco Koch Consulting Engineers H. Wayne Ginn, P.E. File 90441