Fountain Pk P2/PP-DR 980326 (6) Comments for the City of Coppell
Development Review Committee
~PreliminaDv;f-,/e~Plat is not acceptable.
k//Easements will be required for proposed electric.."gas facilities. A plat with
easement requirements will be provided to the developer.
/
{~/Load information (size of structure, A.-C, heat load) will be required from the
developer before easements can be determined.
Other comments
Please call me at 972.-"888-1307 if you have any questions.
Tim Brancheau
14400 l'osey Lane Farmers Branch, Texas 75234