Loading...
Fountain Pk P1/FP-CS 930728 2 ~--4~/-00-'2 /~__ '~ The C~ty W~th A Beaubful Future ..-'"--~ , · '~.,' July 28, 1993 Mr. Tira ~eu~ '":' Matthews Southwest ~. Dallas, TX 75240..- We ~re e~e~osia~ a copy o¢ t~e City o¢ Co~H development ¢~ Add~tioa Cot water i~pact ¢~lw~ter ~p ¢~ as~iat~ with the i~satio~ ~eters. %~e~ ¢~s were ~ot i~ciud~ in your ch~ Cot $~36,828.20 p~d Suly i, t99~ for development Water ~pact :~ $~,250.~ (~% due prior to Council Water ~a~ :~ $~.~ (~%due at ~ssua~ce of Water Meters) Water Meter ~ $124.20 (~% due at ~ssu~ce e¢ Water Meters) ~atio~ Meter ~e~sit $70.~ (t~%due ~t ~ssu~c¢ o¢ Water Meters) Pl~se provide a chec~ made payable to the City o¢ Cop~H i~ t~e ~ou~t o¢ $3,250.~ ~d ¢o~rd it to Aiaa $ohnse~, Acti~8 :i~ce Dir~ter, ~oa~ with a copy o¢ ~ssibie. ~e re~i~8 ¢~s will be due u~ issu~e8 o¢ water ~eters. [~ you will provide a copy o¢ your paid r~eipt to our of~ce, it will help us vedCy payBem o¢ the r~uir~ ¢~s for this proj~t. ~¢ you have ~y questions, ~l~se do ~et ~esi~te to coa~ct ~e. ,./,¢ / I ,-:~.¢~-- Michael A. Ma~i~ ~.~.%. cc: Steve Gora~, ~ Davis, Ce~st~ctien COPPELL PUBLIC WORKS MEMORANDUM DATE: July 22, 1993 ~ FROM: Steven G. Goram, Director of Publi RE: Development Fees for Fountain Park The following fees should be assessed on the above referenced project. Water Impact Fee: 30 - ~'"8" x %" Domestic Meter/s = 30 ESU's 2 - ~%" X ~"~ Irrigation Meter/s = 5 ESU's Total 35 ESU's ~ $650.00 ea = $22.750.00 100% due prior to Council approval of final plat. Wastewater Impact 30 - %" x %" Residential meters = 30 ESU's Total 30 ESU's ~ $225.00 ea = $ 6,750.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 32 Connections ~ $100.00 each = $ 3,200.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 30 Connections ,~ $I00.00 each = $3,000.00 100% due prior to issuance of building permit. DEVELOPMENT FEES Page 2 Utility Final Inspection Fee 30 foes ~ $50.00 lot = 52,500.00 20~% due prior issuance of building permit. Water Meter Fee (Lots) 30 - %" x %" Residential Meters ~ $22.25 ea = $667.50 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) 2 - !" irrigation Meter ~ $62.10 ea = S124.20 Total = $124.20 100% due prior to issuance of water meters. Water Meter Deposit Residential - 30 meters ~ $30.00 ea = $900.00 100% due prior to issuance of building permit. Irrigation Meter Deposit 2 - 1" meters ~ $35.00 ea = $70.00 Total = $70.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. Development Fees Page 3 Street Signs Fee See attacked Street Sion Assessment skeet. !©~% due prior te final acceptance of project. Park Fee Residential Lots ~ $150.00 ea = $ Units (Multi-family) ~ $75.00 ea = $ For Those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined; 30 Residential Lots ~ $350.00 ea = $10,500.00 Units (Multi-family} at $350.00 ea = S 50% of the amount specified above shall be paid by the Developer urior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works ~-e:op;,.:ent Fees Pa~e 4 STREET SIGN ASSESSMENT gke following assessment is being made in accordance with tke City of Coppe!! Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OU~LYTITY EXTENDED PRICE :Jo Parking $53.10 Speed Limit 63.54 6 $381.24 riel d 58.56 Stop 65.12 Street Name 11.60 1 11.60 Stop & Street Combo 96.85 3 290.55 OTHER No Outlet 11.60 2 23.20 TOTAL $706.59 * Cost breakdowns may be obtained from Public Works by written request. HLP/dm cc: Steven G. Goram Director of Public Works ~OE~A=~.HLP FEES.~ .......