Loading...
Cambridge P2/FP-DR 960926 (3) DEVELOPMENT REVIEW COMMITIEE BUILDING INSPECTION COMME ITEM: Estates at Cambridge Manor- Phase H :~ .";':J 9 g lOx'~o ;,ti]. DRCDATE: September 26, 1996 , --- :.. v ,o:~o .~! tit CONTACT: areg Jones, Chief Building Official (304-350tl)~~~] FINAL 1. Show location of street name change 2. Plat notes prohibit swing-in garages. Altached notes reference side entry garage. Is there a difference? Porte-cochere is not a garage and reference to such should be not be worded to reflect that it is. 3. Average building line note is not acceptable by Building Inspection Departn~nt. Show BUs on plat. Attached d~g showing four houses with 18', 22', 18', and 20' do not average to 20' the)' average to 19.5' 4. Section 28 requires that 65%of the PD must meet of exceed SF-7 restrictions which is 25' front BL Can a PD modif)' the zoning restriction?