Loading...
Cambridge P2/FP-DR 960926 (6) TUELECTRiC Comments for the City of Coppell Development Review Committee P~aliminary/Final Plat for Date . ~rcliminary/Final Plat is ~ acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined · t/' Other comments Please call me at ~2-888-1307 if you have any questions. Tim Brancheau 14400 Jose.~ Irene Farmers Branch. Texas 75234