Cambridge P2/FP-DR 960926 (6) TUELECTRiC
Comments for the City of Coppell
Development Review Committee
P~aliminary/Final Plat for
Date
.
~rcliminary/Final Plat is ~ acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined ·
t/' Other comments
Please call me at ~2-888-1307 if you have any questions.
Tim Brancheau
14400 Jose.~ Irene Farmers Branch. Texas 75234