Loading...
Cambridge 1P/Re-DR 950323 (5) "fl;ELECTRIC Comments for the City of Coppell Development Review Committee P~91imtna~y/Fi~,al Pla~ for Date ~~Prplqm.~n~ry/¥inal Plxt is~ acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 144(X) J~se)- Laae Fan~]ers Branch, Texas 75234