Cambridge 1P/Re-DR 950323 (5) "fl;ELECTRIC
Comments for the City of Coppell
Development Review Committee
P~91imtna~y/Fi~,al Pla~ for
Date
~~Prplqm.~n~ry/¥inal Plxt is~ acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
144(X) J~se)- Laae Fan~]ers Branch, Texas 75234