Loading...
Freeport-2.9/Re-CS 971121 Coppell, Texas 75019 /,,'~/~ The City With A Beautiful Future 972-462-0022 ~_.f/ //_~ P.O. BOX478 .-"-----7/ //~"x COPPELL, TEXAS75019 November 21, 1997 T/E Northpoint Partners, Ltd. 10005 Technology Blvd., W.,//151 Dallas, TX 75220 RE: Freeport North~ Replat of Lots l&2. Block 2 and Site Plan Review Dear Sir/Madam: This letter is to inform you that the Freeport North, Replat of Lots l&2, Block 2 and Site Plan Review to allow the development of a 310,000 square foot office/warehouse distribution facility on a 16.588 acre tract of land located at the northwest corner of Royal Lane and Northpoint Drive were recommended for approval by the Coppell Planning and Zoning Commission on Thursday, November 20, 1997, subject to the following conditions: 1) Change Thweatt Road to Sandy Lake Road on the vicinity map on the site plan. 2) City Council modification of the screening wall requirement to allow a 6 foot high berm with a living screen. 3) Payment of impact fees (see Engineering comments). 4) Modify the legal description to include Lot 2. The date scheduled for consideration by the Coppell City Council is Tuesday, December 9, 1997, at 7:30 p.m. A representative for thi.q case must be present at this meeting. Failure to represent this item may result in the denial of this application. City Council has instructed staff to include in its agenda packets only those items which accurately reflect conditions as recommended by the Planning and Zoning Commission. The submittal deadline for revised drawings is 10 a.m., Wednesday. November 26. 1997. Therefore, please submit 17 folded copies of the revised drawings, plus three 8 1/2" x 11" paper reductions on or before that date. The drawings which require change in order to comply with Planning and Zoning recommendations are: Replat and Site Plan. We will also need 17 additional copies of the Landscape Plan and building elevations. If you have any questions, please contact me at (972) 304-3675. Sincerely, Pert Virtanen Assistant Director of Planning & Community Services cc: Pat Acker, Halff Associates, Inc. Isabelle Moro, AICP, P&Z Coordinator Building Inspection Replat: 1. Impact fees will be required.