Freeport-2.1/Re-DR 950629 (5)SE~T BY:TU FAI~IER$ BI~ANCH ; 6-28-95 ; 16:33 ; TU FAP~IF~$ Bl~CH~ 214 304 3673;# 5/11
'H, IELE_ C TRIC
Date
Comments for the City of Coppell
Development Review committee
Preliminary/Final Plat for ~~.. P0~
Preliminary/Final Plat im not acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
Please oall me at 214-888-1307 if you have any questions.
Tim Branoheau
144(10 7o~y I,,a~¢ Faro~.rs B~, Toxas 75~'~4