Loading...
Freeport-2.5/Re-AG 960409C~TY COUNCIL NEETIN~ AGENDA REQUEST FORM April 9, 1996 ITEM CAPTION~ pUBLIC HF~RING: Consideration and approval of Freeport North, Repla~ of Lot 3C and a portion of Lot 5R (Quill CorDoration~, to create a single lot that will allow the development of a 147,000 square foot office/warehouse facility, located on the east side of Royal Lane, approximately 55' north of the intersection of Gateview Boulevard and Royal Lane. , PR OV D BY Oily CCU/ II IL TITLE: Deo~z~on O~ ~O~Zz~on: ~pproved~ w~th oond~t~onz, (7-0) w~th STAFF RECOMMENDATION Approval ~ EXPLANATIONs Please see attached for conditions of approval. Denial BUDGET i~T.$ FIN~C~., COMMEI~S ~ FINANCIAL REVI~ EST. $ · 1./- BUD,S CITY MANAGER REViEN~ A~mda Requtst Forn - Revised 1194 ~a "~o~,,,o~- ~ in ~in~~ Document Name: pzfn3c~r.nll' AGENDA REQUEST NARRATIVE FREEPORT NORTHt REPL~T OF LOT 3C ~ A PORTION OF SR ¢OUILL CORPo} Conditions for approval: (1) A parking special exception needs to be sought from the Board of Adjustment, and (2) compliance with Engineering comments as follows: Site Plan 1. Construct median opening noses per Coppell construction standards 60' minimum for median opening. 2. Show water and sewer meters and sizes. Also, domestic and irrigation met. er should not be tapped off of the fire line. 3. Water, wastewater and roadway impact fees are required. Landscape Plan 1. Show the correct visibility easement per the Subdivision Ordinance and then relocate trees and vegetation greater than 30" high out of the correct visibility sight triangle. Drainage Plan 1. Where do your drainage systems discharge to? May need offsite easements to grade to drain. Entire drainage layout will be reviewed when construction plans are submitted. 2. Show all offsite areas that drain onto this site. You may need to provide public drainage systems in easements. qmda Narrative- Revised 1/94 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE; FREEPORT NORTH, REPLAT OF LOT 3C AND A PORTION OF LOT 511 (.QUILL CORP.) P & Z HEARING DATE: March 21, 1996 C.C. HEARING DATE: April 9, 1996 LOCATION: East side of Royal Lane, approx. 55' north of the intersection of Gateview Boulevard and Royal Lane SIZE OF AREA: 9.5 acres CURRENT ZONING: LI (Light Industrial) REQUEST: APPLICANT: Approval of replat Owner: T/E Freeport North Land II, Ltd. 10005 West Technology #151 Dallas TX 75220 214-904-0907 Fax 214-904-9930 Engineer: Rust Lichliter/Jameson 1420 W. Mockingbird Ln. g300 Dallas TX 75247 214-630-8867 Fax 214-631-8428 HISTORY: The final plat for Freeport North was approved by City Council on August 8, 1984. TRANSPORTATION: Royal Lane is a C4D/6 four-lane divided thoroughfare in a right- of-way containing 110 feet of dedication (adequate for a six-lane divided thoroughfare). Item # 19 SURROUNDING LAND USE & ZONING: North - South - East - West - Vacant, "LI' Light Industrial zoning Vacant, "LI' Light Industrial zoning Vacant, "LI" Light Industrial zoning Vacant, ~LI" Light Industrial zoning COMPREHENSIVE PLAN: The 198'/ Comprehensive Plan shows the property as suitable for light industrial use, as does the proposed 1996 Comprehensive Plan. DISCUSSION: The applicant has cooperated fully with the Development Review Committee to prepare a site plan which complies with engineering, fire protection, zoning and landscaping requirements. The applicant is in process of requesting a special exception from the Board of Adjustment to reduce the required parking spaces to a number justifiable by the nature of its operation. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends approval of the replat, subject to compliance with engineering recommendations and conditioned upon modification of the site plan in the event the Board of Adjustment requires a greater number of parking spaces than those shown. 1) Recommend approval if the replat 2) Recommend disapproval of the replat 3) Recommend modification of the replat ATrACHMENTS: 1) Replat 2) Site Plan and Elevations 3) Land~pe and Irrigation Plan 4) Departmental Comments Item# 19 DEVELOPMENT It EVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Fregoort North. Replat of Lot $C and a _oortlon Of Lot 5R, (_O~dll Corporation? to create a single lot tlutt will allow the development of a 147, 000 square foot office/warehouse facility, located on the east side of Royal Lane, approximately 55' north of the intersection of Gateview Blvd., and Royal lane, at the request of Rust, Lichliter/Jameson. DRC DATE: February 29, 1996 and March 7, 1996 CONTAC F: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) DD~*F li,1171Y A Site Plan 1. Construct median opening noses per Coppell construction standards 60' minimum for median opening. 2. Show water and sewer meters and sizes. Also, domestic and irrigation meter should not be tapped off of the fire line. 3. Water, wastewater and roadway impact fees are required. landscape Plan 1. Show the correct visibility easement per the Subdivision Ordinance and then relocate trees and vegetation greater than 30" high out of the correct visibility sight triangle. Drainage Plan 1. Where do your drainage systems discharge to? May need offsite easements to grade to drain. Entire drainage layout will be reviewed when construction plans are submitted. 2. Show all offsite areas that drain onto this site. You may need to provide public drainage systems in easements.