Loading...
Freeport Pkwy/FP-CS 850410 Date: 4-10-85 Rev. No: 0 DEVELOPMENT IMPACT ANALYSIS Freeport Parkway (street only) A. General 1. Development Name and size: Free~r~parkway - 1700' (street onl~ 4.1 ~cres 2. Owner: Triland Investment Grou~k~_/ 3. Engineer: Albert Halff & Associates 4. Current zoning: LI 5. Current status of development: Final plat and construction plans 6. Location: From 1-635 to existing Freeport Parkway 7. Proposed density: N/A 8. Annexation or land study required: N/A 9. Issues resolved: 100' right-of-way 10. Issues to be resolved: 11. Dedications required: As shown B. Impact 1. Traffic: a. Off-site collector streets: Cowboy Drive (future) b. Off-site arterial streets: Freeport Parkway 2. Sewer: a. Proposed mains: 12" - 18" main b. Proposed connections to existing mains: 12" main @ Freeport 3.Water: 12" main 4.Drainage or Flow: 72" RCP to Grapevine Creek 5. Schools: Not affected a. Primary school: b. Middle school: C. Approvals and Fees 1. Fees: Fees Required Item L (whe_/7_required) Paid to ~ate Preliminary Plat $ 100.00 Final Plat 100.00 Construction Permit Fee ~ 3.25% of construction -- to be Water Availability Fee .' ..'4,140.00 d~termined Sewer Availability Fee '\4,140.00 ..... . .. Park Fee ~, required 2. Assessments and Pro Rata Charge~: ~/ 0O0 a. Item: Street Lights Summary: To be determined b. Item: Street Signs Summary: To be determined 3. Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: 4-10-85 Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: