Freeport Pkwy/FP-CS 850410 Date: 4-10-85
Rev. No: 0
DEVELOPMENT IMPACT ANALYSIS
Freeport Parkway (street only)
A. General
1. Development Name and size: Free~r~parkway - 1700' (street
onl~ 4.1 ~cres
2. Owner: Triland Investment Grou~k~_/
3. Engineer: Albert Halff & Associates
4. Current zoning: LI
5. Current status of development: Final plat and construction plans
6. Location: From 1-635 to existing Freeport Parkway
7. Proposed density: N/A
8. Annexation or land study required: N/A
9. Issues resolved: 100' right-of-way
10. Issues to be resolved:
11. Dedications required: As shown
B. Impact
1. Traffic:
a. Off-site collector streets: Cowboy Drive (future)
b. Off-site arterial streets: Freeport Parkway
2. Sewer:
a. Proposed mains: 12" - 18" main
b. Proposed connections to existing mains: 12" main @ Freeport
3.Water: 12" main
4.Drainage or Flow: 72" RCP to Grapevine Creek
5. Schools: Not affected
a. Primary school:
b. Middle school:
C. Approvals and Fees
1. Fees:
Fees Required
Item L (whe_/7_required) Paid to ~ate
Preliminary Plat $ 100.00
Final Plat 100.00
Construction Permit Fee ~ 3.25% of construction -- to be
Water Availability Fee .' ..'4,140.00 d~termined
Sewer Availability Fee '\4,140.00 ..... . ..
Park Fee ~, required
2. Assessments and Pro Rata Charge~: ~/ 0O0
a. Item: Street Lights
Summary: To be determined
b. Item: Street Signs
Summary: To be determined
3. Approvals
a. Annexation
b. Land study: P&Z, City Council
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer:
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer: 4-10-85
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period: