Freeport Pkwy/FP-CS 850418April 18, 1985
~~-~W~hin 500 ft. of IH635. This will also inc~
an e~mnsion of C~y Drive and a tie-in with Gateway Bouleva~4.
The State Highway Department will construct an overpass within
.~/n!'~'10~: months that will connect Freeport Parkway in Coppell
that portion of the road that exists in Irving.