Loading...
Gatew-1.4/Re-DR 960229 (2) 'I E LEC TRIC Comments for the City of Coppell Development Review Committee Date /P. relimina~y/Fxnal P~=t is Z~z~-acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. ~/ Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be ~/0determined' Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Jose}' Lane Farmers Branch, Texas 75234