Gatew-1.4/Re-DR 960229 (2) 'I E LEC TRIC
Comments for the City of Coppell
Development Review Committee
Date
/P. relimina~y/Fxnal P~=t is Z~z~-acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
~/ Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
~/0determined'
Please call me at 214-888-1307 if you have any questions.
Tim
Brancheau
14400 Jose}' Lane Farmers Branch, Texas 75234