Gatew-1.4/Re-DR 960229 (5) DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gateway Business Park, Replat of Block 2 (Haverty's), to create Lots
IR, 2R and 3 that will allow the development of a 220,675 square
foot regional distribution facility and a 50,000 square foot outlet
center, located at the northwest comer of Gateway Blvd., and
Freeport Pkwy., at the request of lIalff Associates, Inc.
DRC DATE: February 29, 1996 and March 7, 1996
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer
004-3679)
REVISED
A~IER P&Z
Replat Comments
1. Provide water, sanitary sewer and drainage plans.
2. Show sight-visibility triangles at all ingress/egress points.
3. Show fire lanes.
4. Remove reference to "Future Gateway Blvd."
5. Note//2 under deviation from Subdivision Ordinance should state "with the exception
of Roadway Impact fees".
6. Note //4 under deviation from Subdivision Ordinance should be clarified. The
permanent drainage system should be constructed through Lot 1R.
7. Gateway Circle should be offset from the proposed driveway to the south by 125' or
lined up.
8. The temporary drainage easement should be abandoned with this plat.
Site Plans
1. Driveways must be spaced at a minimum of 100' to comply with the City's Subdivision
Ordinances.
2. Label the streets on the southside of the development.
3. Water, wastewater and roadway impact fees are required.
4. Indicate the right-of-way width for all adjacent streets.