Gatew-1.4/Re-DR 960229 (6) DEVELOPMENT REVIEW COMMI EE
ENGINEERING COMMENTS
ITEM: Gateway Business Park. Replat of Block 2 (Haverty'sL to create Lots
IR, 2R and 3 that will allow the development of a 220,675 square
foot regional distribution facility and a 50,000 square foot outlet
center, located at the northwest comer of Gateway Blvd., and
Freeport Pkwy., at the request of Halff Associates, Inc.
DRC DATE: February 29, 1996 and March 7, 1996
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer
0o4-3679)
PRELIMINARY I~ VIS E D
AFTER P&Z
Replat Comments
1. Provide water, sanitary sewer and drainage plans.
2. Show sight-visibility triangles at all ingress/egress points.
3. Gateway Circle should be offset from the proposed driveway to the south by 125' or
lined up.
4. Water, wastewater and roadway impact fees are required.