Loading...
Gatew-1.4/Re-DR 960229 (6) DEVELOPMENT REVIEW COMMI EE ENGINEERING COMMENTS ITEM: Gateway Business Park. Replat of Block 2 (Haverty'sL to create Lots IR, 2R and 3 that will allow the development of a 220,675 square foot regional distribution facility and a 50,000 square foot outlet center, located at the northwest comer of Gateway Blvd., and Freeport Pkwy., at the request of Halff Associates, Inc. DRC DATE: February 29, 1996 and March 7, 1996 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 0o4-3679) PRELIMINARY I~ VIS E D AFTER P&Z Replat Comments 1. Provide water, sanitary sewer and drainage plans. 2. Show sight-visibility triangles at all ingress/egress points. 3. Gateway Circle should be offset from the proposed driveway to the south by 125' or lined up. 4. Water, wastewater and roadway impact fees are required.