Gatew-1.4/Re-CS 960326 Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
~ P.O. Box 478
Coppell. Texas 75019
March 26, 1996
Catellus Development Corp.
4545 Fuller Drive, #100
Irving, TX 75038
RE: Gateway Business Park. Replat of Block 20taverty's)
Dear Sir/Madam:
This letter is to inform you that your request for approval of Gateway Business Park, Replat of
Block 2 (Haverty's), to create Lots IR, 2R and 3 that will allow the development of a 220,675
square foot regional distribution facility and a 50,000 square foot outlet center, located at the
northwest comer of Gateway Boulevard and Freeport Parkway, was recommended for approval
by the Coppell Planning and Zoning Commission on Thursday, March 21, 1996. The following
conditions apply:
(1) The signature block for the Acting City Secretary be amended to read City
Secretary;
(2) a parking special exception needs to be sought from the Board of Adjustment;
(3) minor landscaping revisions need to be made, particularly around the pick-up
(4) square footage of the office space needs to be determined to be either 7,000 or
7,200 sf, and
(5) compliance with Engineering comments (copy attached).
The date scheduled for consideration by the Coppell City Council is Tuesday, April 9, 1996, at
7:30 p.m. A representative for this case must be present at this meeting. Failure to represent
this item may result in the denial of this application.
Sincerely,
Pert Virtanen
Assistant Director of Planning & Community Services
cc: Pat Acker, Halff Associates, Inc.
Isabelle Moro, P&Z Coordinator
Building Inspection
1
DEVELOPMENT REVIEW COMMI EE
ENGINEERING COMMENTS
ITEM: Gateway Business Park. Replat of Block 2 (Haverty'sL to create Lots
IR, 2R and 3 that will allow the development of a 220, 675 square
foot regional distribution fadlity and a 50,000 square foot outlet
center, located at the northwest comer of Gateway Blvd., and
Freeport Pkwy., at the request of Halff Associates, Inc.
DRC DATE: February 29, 1996 and March 7, 1996
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer
0o4-36~9)
COMMENT STATUS: PRELIMINARY ~'FINAL REVISED
AFTER P&Z
Replat Comments
1. Provide water, sanitary sewer and drainage plans.
2. Show sight-visibility triangles at all ingress/egress points.
3. Gateway Circle should be offset from the proposed driveway to the south by 125' or
lined up.
4. Water, wastewater and roadway impact fees are required.