Loading...
Gatew-3.1/SP,PP-AG010410 '1' H B: C I T Y 0 F' '~ C-OPP-EL£ AGENDA REQUEST FORM CITY COUNCIL MEETING: April 10, 2001 ITEM ITEM CAPTION: Consider approval of Gateway Business Park No. 3, Lot 1, Block A, Site Plan and Preliminary Plat, to allow the construction of two 32,061 square foot office/warehouse buildings on 7.863 acres of property located at the northeast comer of Freeport Parkway and Airline Drive TITLF_~ D~ector of Planning)tnd STAFF CO~& Community Services Date of P&Z Meeting: March 15, 2001 Decision of P&Z Commission: Approved (5-0) with Commissioners McGahey, Nesbit, Clark, Halsey and Stewart voting in favor. None opposed. APPROVED BY CITY COUNCIL DATE Approval is recommended, with the following conditions PLAT CONDITIONS: 1 T .t.~, +~.~ ~ nn ..... n ~^a-,~;. (CONDITION MET) (CONDITION MET) Final Plat approval shall not be granted until a color board and complete set of building elevations is reviewed and approved by the Planning & Zoning Commission and City Council. SITE PLAN CONDITIONS: A Staff recommends~q~pr,~val. DIR, INITIALS:~5 . Agenda Request Form - t[evised 5/00 P,'mr;a= r~;+-, e+,-,¢4' 1X. (CONDITION MET) Provide a note similar to the floodplain maintenance note shown on the plat on the comprehensive site plan Prior to City Council review, the applicant shall work with staff to create a mutually agreeable development standard that will address the maintenance/improvemeot of the floodplain area (lotlx). T ,~,M +1-,~ 1 nn ..... .c1~^,4~1~;~ ~. ,~.~ .;,~ _~.. (CONDITION MET) p ....... ~,. (CONDITION MET) FIN. REVIEW: c~ CITY MANAGER REVIEW: Document Name: ~GATESPPP CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: GATEWAY BUSINESS PARK NO. 3 LOTS ! & 1X, BLOCK A SITE PLAN AND PRELIMINARY PLAT P & Z HEARING DATE: C.C. HEARING DATE: March 15, 2001 April 10, 2001 LOCATION: SIZE OF AREA: CURRENT ZONING: REQUEST: At the northeast comer of Freeport Parkway and Airline Drive. Approximately 7.863 acres of property. LI (Light Industrial) Preliminary Plat and Site Plan approval for two 32,061 square foot office buildings. APPLICANT: HISTORY: TRANSPORTATION: Park West Commerce Center 15350 SW Sequoia Pkwy Suite 300 Portland, OR 97224 (503) 624-6300 FAX: (503) 624-7755 HalffAssociates, Inc. Chris Amarante 8616 Northwest Plaza Drive Dallas, TX 75225 (214) 739-0095 (214) 739-0096 O'Brien & Associates Mick Granlund 5310 Harvest Hill Road, Suite 136 Dallas, TX 75230 (972) 788-1010 FAX: (972) 788-1024 There has been no platting history on the subject property. Airline Drive is a CAU, four-lane undivided street built to standard, within a 60-foot fight-of-my. Freeport Parkway is a four-lane divided road in an 80'-wide fight-of-way. Freeport Parkway is proposed to be expanded to a six-lane roadway in a 110'-wide fight-of-way. Item # 10 SURROUNDING LAND USE & ZONING: North- vacant land; LI, Light Industrial South - vacant land/G&K Services; LI, Light Industrial East- Park West Commerce Center sign/MJ Designs; LI, Light Industrial West - Avaya Telecommunications; LI, Light Industrial COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for light industrial/showroom uses. DISCUSSION: The applicant is requesting Site Plan and Preliminary Plat approval for Lots 1 and 1X, Block A of Gateway Business Park No. 3, subdividing the 7.864 acres of property into two separate lots, with Lot 1X containing the floodplain area of Grapevine Creek. The request for site plan approval is for Lot 1, which contains 5.241 acres of property. The applicant is proposing to develop two 32,061 square foot office buildings, with accessory parking. The applicant proposes to construct 100% office uses within the buildings, providing a total of 256 parking spaces, well over the 214 spaces required. As a result of the office uses, no truck service/dock doors are proposed. However, the applicant has provided four standard loading spaces/zones to accommodate deliveries, etc. All perimeter, interior, and non-vehicular landscape requirements have been met. The property fronts on both Airline Drive and Freeport Parkway; additional right-of-way was needed along Freeport Parkway and 15' along the western edge of both Lots 1 and 1X was dedicated for future Freeport Parkway right-of-way. Additionally, because Freeport Parkway is a secondary image zone, an 8'-wide brick paver band is proposed at the entrance along Freeport Parkway. Architecture The architecture of the proposed office facility will not be discussed as part of this application. Because details on building materials have not been finalized, the applicant has requested that the architectural details and building elevations be reviewed in conjunction with Final Plat approval. Although an unusual request and one that staff would not normally support, staff has recommended approval subject to the submission and approval of elevations and a color board prior to Final Plat approval. Item# 10 Preliminary Plat Lot 1X is located within a floodplain area of Grapevine Creek. At the request of staff, the applicant has placed a note on the plat indicating that maintenance of the floodplain/easement area is the responsibility of the owner. Staff would like to further reiterate that maintenance of this area means that cleaning, mowing, trash/debris pick-up and general upkeep of this area is required. To ensure that the floodplain area is well maintained, staff has recommended that a similar maintenance note be placed on the site plan and an additional note be provided on the site plan defining maintenance as noted above. Staff would also encourage the applicant to not only maintain, but improve the floodplain area similar to improvements made by adjacent improved properties. Additionally, staff has requested that the applicant provide a comprehensive site plan, showing both Lot 1X and the proposed site design of Lot 1. This sheet should be included in the submission packet. The proposed preliminary plat will establish all fire lanes, easements, and dedications. As mentioned above, a note has been placed on the plat requiring maintenance of the floodplain and drainage easement by the owner. Additionally, staff has requested that the applicant clearly label the 100-year floodplain and a comer clip at Freeport Parkway and Airline Drive. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of the site plan and preliminary plat, subject to the following conditions: PLAT CONDITIONS: Label the 100-year floodplain. Provide a 10 x 10 right-of-way comer clip at Freeport Parkway and Airline Drive. Final Plat approval shall not be granted until a color board and complete set of building elevations is reviewed and approved by the Planning & Zoning Commission and City Council. SITE PLAN CONDITIONS: Provide City Staff with a copy of a comprehensive site plan, including both Lot 1 and Lot 1X. Provide a note similar to the floodplain maintenance note shown on the plat on the comprehensive site plan Provide a note on the comprehensive site plan that defines maintenance (of the floodplain area) as mowing, trash/debris removal, and general Item# 10 upkeep of the area and indicates that the condition of the floodplain area shall be treated in the same manner as the adjacent improved properties. Label the 100-year floodplain on the site plan. Revise size notations on Landscape Plan to indicate the caliper inches of trees at the time of planting. ALTERNATIVES: 1) 2) 3) 4) Recommend approval of the request. Recommend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) Preliminary Plat (Sheets 1 & 2) Site Plan Landscape Plan (Sheets 1 & 2) Landscape Details Item # 10 Ap~-03-01 02:55P O'B R ARCHI MEMO IEN & ASSOCIATES, IN C T E C T U R E ' p L A N N IN G . I N T E R I O R ./ FAX v/ PHONE MTG. FILES Date: To: Re' 4/02/01 Ms. Andrea Roy City of Coppell Gateway Business Park, No. 3, Lot 1 Blk A Concerning the improvements to the drainage channel, the owner is willing to commit to the following; I. Removal of trash and brush down to the creek bed similar to adjacent landowners. 2. Fine grading as required within the channel area. 3. Hydromulch the channel with Common Bermuda mix. 4. Provide temporary irrigation as required to establish growth. 5. Provide ongoing maintenance to includtYig mowing and trash removal. If you have further questions please feel free to contact me. Sincerely, Mick Granlund 5310 Harvcst Hill Road ' Suite136. LB I61 · Dallas, TX 75230 ,, (972) 788-1010 · FAX(972)788-4828