Loading...
Gatew-2.2/PP,SPRv-DR 981029 (2) ---------L-O- - TUElectric Text8 Utllltle~ Comp~nl®~ Comments for the City of Coppell Development Review Committee Gateway Business Park, Lot 1 and 2, Block A and Lot 1, Block B, Preliminary Plat and Site Plan Review for Lot 2, Block A. October 29, 1998 X Preliminary Plat is acceptable. X Easements will be required for proposed electric/gas facilities. A plat with easement requirements will be provided to the developer. X Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. X Other comments Please contact Jeff Curry at 972-570-4126 to discuss loads and easements. Please call me at 972/888-1307 if you have any questions. Tim Brancheau OCT 2 q 1995 14400 Josey Lane Farmers Branch, Texas 75234