Gatew-1.4/Re-CS 90120309,".t6.,'93 09:28 "~21~t 739 0095 rl~,LFF ASSOCIATES ._~],0.02.,'0,03,. ,
~/ ALBERT II. hALI-'f ASSOCIATES, INC.
DALLAS * ARi,INGTON * CHICAGO · FORT WORTH AVO 10776
9~16 NCRTHVgEST PLAZA DR:YE · DALLAS TEXAS 75225
214/739-009-~
City of Coppell
Publ/c Works Department
P.O. Box 478
Coppell, TX 75019
Att: Ms. Shohre Daneshmand, P.E.
Re: Paving, Drainage, Water, Sanitary Sewer, and Bridge Improvements for Southwesterr~
Drive between Freeport Parkway and Belt Line Road
Dear Shohre:
Attached please find 2 sets of revised plans for the above referenced project along
with the City of Coppcll's preliminary markups. These are submitted for your review and
approval.
The improvements to Southwestern Drive will not be constructed until such time as
deemed necessary by the City of Coppell duc to traffic or infrastructure demands. In the
interim period, modifications of median openings due to site development are highly
probable. As a result, Prentiss/Copley Investments Group wishes to delay submitting
landscaping plans at this time. These plans can be more efficiently prepared at a later date.
Also, in the intercst of both the client and the City of Coppell, portions of the new
existing 24" water iine, which will be under one lane of proposed pavement, have not been
relocated to simply avoid being under pavement. Relocation of all of this line would be a
major unnecessary, expense to the client and to the City. Being a transmission type line and
not a site feeder, future taps will not be necessary, and maintenancc and connections should
not be a factor in the situation.
Please feel free to call me if you have any questions.
Sincerely,
ALBERT H. FDXT .l~ ASSOCIATES, INC.
Roman C. Plugge, J'r., P.E.
Enclosure
cc: Ma'. Mike Tucker, Prentiss Properties Ltd., Inc.
T~ANSiaOIRTAYION · WATEF~ R[:$OUF~$ · '.-AI~O ~I~VELO~MENT $ M~flIC;P,t~. ENVIRC'~MENTAL S.'.'.'~L.IC~[JRA~
09:16/'95 09:29 9214 739 0095 ~LFF ASSOCIATES ~005/005
GINN, INC. CONSULTING ENGINEERS
December 11, ~990 :
Ms. Shohre Daneshmand, P.E.
city o5 coppe ,ctFf tZlu :r
P.O. Box 478 ' "
Coppell, TX 75019 DEC I8 19§0
Re: Park west Commerce Center
Southwestern Boulevard :~,{'~{{{~%~,i~.
Dear Ms. Uanedhmand:
Pursuant to your request, on the attached letter, for our
comments, we offer the following.
1. We did not re-review the mark-ups to see if all prior
comments had been addressed. If you want us to, please have
Ben send us the revised plans after st~ff has had '&n
opportunity to review their comments.
2. We understand that the improvements to Southwestern
Boulevard will not be done until such time a~ traffic or
City Engineer demands it to be constructed. We have no
objection to this. If median openings are not "set" and the
road not constructed, then we have no objection to allowing
landscaping plan~ being submitted at a later date. Our
suggestion would be, that prior to receiving a per~it to
construct Southwestern Boulevard, the landscape/irrigation
plans be submitted, reviewed and approved.
3. We have no objections to allowing the 24" waterline to
remain under the pavement, in lieu of relocating it
elsewhere. Please have Howard Pa£ford indicate his
preference.
Should you have any further questions, please feel free to
contact our office.
Sincerely,
Gabe Favre
GF/dsp
enclosure
cc: Howard Pafford
RAck Wieland
Albert Halff & Associate~ - Roman Plugge, P.E.
H. Wayne Ginn, P.E.
File 90441
17103 Proton Road ·Suitc 100 · LB 118 · Dallas, Texas75248 · Phone 214/248-4900