Loading...
Gatew-1.4/FP-CS 900507 (.;INN, 1NC. CONSI i.,TING EN{;INEEIIS PLAT/PLAN REVIEW MEMORANDUM ~':.-( ....... .w~--_ .. .- Date: May 7, 1990 To: City of Coppell Public Works Department!'',' ~--8~ ) / '~ From: John C. Karlsruher, P.E. (--~C~____ ........ Re: Review Comments for the Final Plat and Engineering Plans - Gateway Business Park Addition FINAL PLAT: No comments PAVING PLANS: 1. Specify concrete pavement thickness and strength to avoid confusion due to the design of non-standard streets. WATER AND SEWER PLANS: 1. Show pipe sizes adjacent to water lines and sewer lines. 2. A 16" water line must be installed in Gateway Blvd. 3. Maximum manhole spacing on sanitary sewer lines is 500 feet. Revise plans accordingly. 4. Eliminate drop in manhole at Station 20+80.79, Line "A". 5. Use D.I. pipe encased in concrete at Station 0+47 Sanitary Sewer Line "A-i"; Station 0+47 Sanitary Sewer Line "A-2"; and Station 0+25 Sanitary Sewer Line "B-i". 6. Show details of 12" water line at Station 31+25 in Gateway Blvd. (ie. restraining glands, thrust blocking, etc.). 7. Increase vertical clearance between Sanitary Sewer Line "B" and double 60" R.C.P. at Station 4+60 (Line B). DRAINAGE PLANS" 1. Open channels must be maintained by property owner. 2. Show proposed storm sewer layout on drainage area map. 3. Show HGL on storm sewer profiles. cc: Gary Sieb Taryon Bowman Pat Acker, Albert H. Halff & Assoc., Inc. 17103 Prcslon P, oad · Suite I00 · IB II8 · Dallas. 'texas 75248 · Plmnc 214-2.18-.10f}¢1