Gatew-1.2/Re-DR 960229 (2) '
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Gateway Business Park. Replat of Block 1 (Fritz Companies, Inc.),
to create two new lots that will allow the development of a 307, 872
square foot office warehouse distribution facility and a 169,~.~.~.
square foot office warehouse building, located on the southwest
comer of Freeport Pkwy. and Gateway Blvd., at the request of
Brockette/Davis/Drake, Inc.
DRC DATE: February 29, 1996 and March 7, 1996
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer
004-3679)
COMMENT STATUS: ~'PRELIMINARY
Replat Comments
1. Show the zoning of adjacent properties.
2. Show the fire lanes on both lots.
3. Impact fees required.
Block 1, Lot 1
Preliminary Site Plan
1. The intersection of Cotton road and Gateway Blvd. is a 3 leg intersection and not a 4
leg intersection as shown on Sheet L1.01 and Al.01.,
2. The two driveways at the northeast corner of the property do not meet the City's
standard for driveway spacing of 100'. Probably should eliminate the eastern most
driveway.
3. Impact fees are required to be paid prior to final plat approval.
4. You should begin your driveway radius 20' from the inlet box.
5. Provide water and sanitary sewer plans.
6. Show the curb return radius. A larger radius should be provided for the truck court
areas.
7. Show driveway widths.
8. Label fire lanes.
9. There is a proposed street on the north side of Gateway. You should offset your
driveway by 125' or line up with the street.
........ :--_._.'_¥-... ' .-.
Page 2
Gateway Business Park Block 1
Block 1, Lot 2
Preliminary Site Plan
1. You should begin your driveway radius 20' from the inlet box.
2. The driveway proposed at the northwest corner of the property along Gateway Blvd.
must be spaced at least 100' from the proposed driveway of the development to the
west.
3. Provide water and sanitary sewer plans.
4. Label fire lanes.