Loading...
Gatew-1.2/Re-DR 960229 (5) 2 9 /996 COPPELL LEISURE SERVICES DEPAR~~~..~_j MEMORANDUM DATE: February 29, 1996 TO: Gary L. Sieb, Director of Planning and Community Services FROM: Rick Wieland, Parks Development Coordinator'~. RE: D.R.C. Review - Comments on Gateway Business Park, Replat of Block 1 (Fritz Companies, Inc.) The Leisure Services Department has reviewed the above referenced development, and would offer the following comments for the February 29, 1996 Development Review Committee meeting. 1. The area of the property that has frontage along Freeport Parkway has been identified in the Trail System Master Plan. The applicant will be required to dedicate an area twenty-four feet (24') wide along Freeport Parkway, for the Freeport Parkway Greenwalk. Contact will need to be made with the Director of Leisure Services and the City Engineer regarding this matter. 2. Landscape and Irrigation plans are required to be submitted for the proposed platting. These plans will comply with the Streetscape Plan, found in the Subdivision Ordinance. 3. Any construction activity planned which involves city maintained parkways, deceleration lanes, median cuts, left turn lanes or medians must be coordinated through the Leisure Services Superintendent, Dennis Slayton, at 304-3554. 4. The contractor is responsible for any repair or replacement of landscaping, irrigation or utilities that are affected by construction of this development. See comment//3. This includes any required boring work associated with the median. 5. A detailed irrigation plan, identifying line sizes, controller, etc. is needed. The irrigation controller is required to have a freeze protection device, surge protector, and rain sensor. 6. The contractor will be assessed for all irrigation meters located on the project. Should there be any questions by committee members or representatives of the proposed development regarding these comments, please feel free to contact me at 304 -3553, or Gary Sims at 304 -3560. RSW/rsw FEB 2. 9 les''' DRC229.96M