Loading...
Gatew-1.1/PP-CS 900214 (2) ALBERT H. HALFF ASSOCIATES. INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS · ARLINGTOX · CHICA(;O · FORT WORTH E6'6 'JC~,--WES- =_:-Z~ OF ,'E · 2~'.L_a.~ -E,'~,S 7£22~ 2'-: T%D-2C:34 February 14, 1990 AVO 10564SS / PP01 City of Coppell i:: )~ ,~ ....;'=?-"":"~'-' :.. _.- ..'.-'...!."_, !.' 255 Parkway I" a~" i FEB ! $1900 i!;', ; Coppell, Texas 75019 ! 1;! ~ ii ',','i iL: ~ ;' ' ' I Attention: Ms. Taryon Bowman Re: Oateway Business Park - Preliminary Blat Dear Ms. Bowman: Please find attached 15 copies of the above referenced preliminary plat and plans revised per city comments along with I copy of the water and wastewater demand analysis for this project. This data was submitted for review on January 19, 1990. We have requested that this plat be scheduled for the March 15, 1990 Planning Commission Meeting. Also please find enclosed the subdivision application and preliminary plat fee of $112.00. All City. comments from the advanced submittal of the preliminary plat and plans have been addressed with the exception of preparation of conceptual landscape plans. Landscape design is currently underway and will be submitted as soon as possible. Please note that a revision to the master thoroughfare plan has already been requested thru this project. In addition we are requesting the following: 1. Overhead power to be allowed along the back and side property lines of the project with the understanding that no overhead power will be constructed across or within street right-of-ways within this project. 2. The landscaping of Parkways shall be completed as the individual lots are developed. ALBERT H. HALFF ASSOCIATES. INC. ENGINEERS ~ SCIENTISTS · SURVEYORS City of Coppell February 14, 1990 Page 2 3. All applicable fees, shall be paid by lot owners as the individual lots are developed and replatted. 4. That temporary open channel drainage will be allowed without a concrete pilot channel. In addition that brick facing on the headwalls be eliminated for the temporary drainage structures. These channels will be enclosed in a pipe system as the property, is developed. The headwalls will not be visible from the roadways. The Owner's current plan is to retain ownership of the land and lease sites to tenants, therefore, no property owners association will be formed. Thank you for your time and consideration in these matters. If you require any additional information please contact me. Yours very truly, Al .BERT H. HALFF ASSOCIATES, INC. : ,.~"~'b -~ ~ ~"~ . Patrick Lee Acker, P.E. /vdw cc: Wayland Threadgill Santa Fe Pacific Realty Corporation