Loading...
Gatew-2.2/PP,SPRv-DR 981029 (4)DE VEL OPMENT RE VIE W COMMI ~17 EE ENGINEERING COMMENTS ITEM: G~tewav Business Park, Lot 1 & 2, Block A and Lot 1, Block B, Preliminar~ Plat and Site Plan Review for Lot 2, Block A, to allow the creation of 3 new lots and the development of a 2-story 103,611 square foot office building on Lot 2, located along the north side of l. H. 635, and east of Freeport Parkway, at the request of Halff Associates, Inc. DRC DA TE: October 29, 1998 and November 5, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENTSTATU$: p~,~r rn/rrnrn ov t~rnra r ,/REVISED AFTER P&Z 1) A left mm lane will need to be constructed on Freeport Parkway to the proposed street. 2) Work done in the state right-of-way must be approved by the Texas Department of Transportation (TxDOT). 3) Any paving treaanent (e.g. brick pavers) in the city right-of-way not required by ordinance will be maintained by the property owners association.