Grand Car/Re2-DR 970227 (6) "]'~ELECTRIC .......
Comments for the City of Coppell
Development Review Committee
Preliminary/Final Plat for ,
Date
,/ Pr~limi~,~_y/Fi~,~l Plat is not acceptable.
~/ Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
· ~ Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Jose>' Lane Farmers Branch. Iexas 75234