Loading...
Grand Car/Re2-DR 970227 (6) "]'~ELECTRIC ....... Comments for the City of Coppell Development Review Committee Preliminary/Final Plat for , Date ,/ Pr~limi~,~_y/Fi~,~l Plat is not acceptable. ~/ Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. · ~ Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Jose>' Lane Farmers Branch. Iexas 75234