Loading...
Gibbs Stat P1/Re-AG 940712CITY COUNCIL MEETING: AGENDA REQUEST FORM ITEM CAPTION: PUBLIC HEARING: Consideration and approval of Gibbs Station, Phase One, Replat of Lots 1-13, Block E, located generally south and east of the intersection of Beverly Drive and Creek Crossing, at the request of Dowdey, Anderson & Associates, :~ E~ ~.-~ C~ ~ TITLE: ~r of--P/~nning & Comm. STAFF COMMENTS: Date of P&Z Meetinq: June 16, 1994 Decision of P&Z Commission: Approval Services (5-0-1) with Commissioners Wheeler, Thompson, Tunnell, Meador and Redford voting for approval. None opposed. Commissioner Hildebrand abstained. STAFF RECOMMENDATION Approval EXPLANATION: See attachment for conditions. Denial BUDGET AMT.$p/$ FINANCIAL COMMENTS: MT. EST.$ +/- BUD:$ FINANCIAL REVIEW: Agenda Request Fomu - Revised 1/94 CITY MANAGER REVIEW: AGENDA REQUEST NARRATIVE Gibbs Station, Phase One, Replat of Lots 1-13, Block E The following conditions apply: Zoning must be shown on the Replat; extend the easement across Lot 1, Block E, to the property to the northwest; replat must show drainage and access easement; the entire floodplain must be shown on the Replat, and the floodway boundary note needs to reflect a date of April 15, 1994. Ageuda Narrative - RevLsed 1/94 SUPPORT DOCUMENTATION FOR AGENDA ITEM STAMP RECEIVED BY CITY MANAGER'S OFFICE: SUPPORT DOCUMENTATION SUBMITTED WITH ITEM: MEMOS/LETTERS/REPORTS/BILLS/MINUTE : NO. OF ORIGINALS REOUIRED X 1 fora total of 2 pages CONTRACT/AGREEMENT ............ : C.I.P. CONTRACT .................. : CHANGE ORDERS ................. : 3 originals for signature 6 originals for signature 3 originals for signature ORDINANCE ..................... : CAPTION ....................... : RESOLUTION ..................... : PROCLAMATION .................. : 1 blueback for signature + 3 copies I blueback for signature 2 blueback for signature + 1 copy 2 blueback for signature + 1 BIDS ........................... SUPPORTING DOCUMENTS (narrative) .... (over 10 pages or 5 double sided in length) LOCATION MAPS ................... ZONING PLANS .................... PRELIMINARY/FINAL PLATS ........... SITE PLANS ....................... LANDSCAPE PLANS ................. ARCHITECTURAL RENDERINGS ........ LENGTHY DOCUMENTS .............. (zoning, subdivision ordinance, master plans) DATE PUBLISHED IN THE CITIZENS' ADVOCATE: (to meet legal requirements prior to consideration by council) NOTIFICATION TO: Property owners within 200 feet METHOD OF CONTACT: Notice NOTES 1 each 19 + original 14 14 X 14 14 14 14 14 June 24, 1994 Agenda Request Distribution - Revised 1/94 CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT GIBBS STATION, PHASE ONE ADDITION, REPLAT, LOTS 1 through 13, BLOCK E P & Z HEARING DATE: June 16, 1994 C. C. HEARING DATE: July 12, 1994 LOCATION: Generally south and east of the intersection of Beverly Drive and Creek Crossing SIZE OF AREA: 13 lots (1 through 13, block E), and containing 4.013 acres CURRENT ZONING: PD-SF-7 REQUEST: Replat of 13 lots--1 through 13, Block E APPLICANT: HISTORY: Dowdey, Anderson and Assoc. (Engineer) 16250 Dallas Parkway, Suite 100 Dallas, Tx. 75248 931-0694 This property was rezoned and platted approximately 18 months ago TRANSPORTATION: Creek Crossing is a local neighborhood street of 27 foot width contained within a 50 foot r.o.w. SURROUNDING LAND USE & ZONING: North - South - East West - vacant; SF-7 developing single family homes; PD-SF-7 developing single family homes; PD-SF-7 developing single family homes; PD-SF-7 Item 12 COMPREHENSIVE PLAN: The Plan shows multi-family uses as most appropriate here. ANALYSIS: This request is a replat to add additional land to several (13) lots which are immediately adjacent to the Elm Fork of the Trinity River. The purpose of this replat is to add land to each of these lots, construct a retaining wall to minimize erosion on the banks of the lots, and to enlarge each lot by the dimension shown on the replat. Staff supports the request with the following revisions: zoning needs to be shown on plat extend the easement across Lot 1, Block E to the property to the northwest drainage easements are typically 20 feet wide, not 15 as shown plat needs to show drainage and access easement on the plat entire floodplain needs to be shown on plat floodway boundary note needs to reflect a date of April 15, 1994 With these revisions, staff would recommend approval of the replat. ALTERNATIVES: 1) Approve the replat 2) Deny the replat ATTACHMENTS: 1) Replat document · stf 15. PUBLIC HEARING: Consideration and approval of Gibbs Station. Phase One. Replat of Lots 1-13, ~ located generally south and east of the intersection of Beverly Drive and Creek Crossing, at the request of Dowdey, Anderson & Associates, Inc. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council. Mayor Morton opened the Public Heating and asked for those persons wishing to speak against this proposal. Bill Schaumburg, 236 Hollywood Drive, addressed Council. The Mayor then asked for those persons wishing to speak in favor of this proposal. Craig Knight, representing the Developer, spoke in favor of this proposal. Lance Williams, 3811 Turtle Creek Boulevard, Suite 1050, Dallas, Texas, representing the Lakes of Coppell Homeowner's Association, did not take a stance on this proposal, but spoke to the Council regarding common areas. Ken Griffin, City Engineer, made a presentation to the Council regarding retaining walls. Councilmember Watson moved to close the Public Hearing and to deny approval of Gibbs Station, Phase One, Replat of Lots 1-13, Block E, located generally south and east of the intersection of Beverly Drive and Creek Crossing. Councilmember Reitman seconded the motion; the motion to deny carded 7-0 with Mayor Pro Tern Robertson and Councilmembers Alexander, Stahly, Watson, Reitman, Mayo, and Sheehan voting in favor of the motion. 16. Consideration and approval of Gibbs Station. Phase Two. Re_olat of Lots ~_!~_3_,5_~1~]~L~, located generally south and east of the intersection of Beverly Drive and Creek Crossing, at the request of Dowdey, Anderson & Associates, Inc. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council. Mayor Morton opened the Public Heating and asked for those persons wishing to speak against this proposal. Lance Williams, attorney for Lakes of Coppell Homeowner's Association, addressed the Council in opposition to this proposal. The Mayor then asked for those persons wishing to speak in favor of this proposal. There were none. Mayor Pro Tem Robertson moved to close the Public Heating and deny approval of Gibbs Station, Phase Two, Replat of Lots 14-35, Block E, located generally south and east of the intersection of Beverly Drive and Creek Crossing. Councilmember Alexander seconded the motion; the motion to deny carried 7-0 with Mayor Pro Tem Robertson and Councilmembers Alexander, Stahly, Watson, Reitman, Mayo, and Sheehan voting in favor of the motion. Council directed Staff to conduct an engineering study regarding the creek issue and bring something back to Council in August. Councilmembers expressed a desire to hear from the homeowners involved. 17. PUBLIC HEARING: Consideration and approval of S-1081. Arbv's Restaurant, to change the zoning from LI (Light Industrial) to LI-S.U.P. (Light Industrial, Special Use Permit) located near the southwest corner of MacArthur Boulevard and Beltline Road, at the request of Winkelmann & Associates, Inc. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council. Mayor Morton opened the Public Hearing and asked for those persons wishing to speak against this proposal. There were none. He then asked for those persons wishing to speak in favor of this proposal. John Evans, Applicant, spoke in favor of this proposal. Ken Griffin, City Engineer, addressed the Council concerning the traffic issues. Consensus of Council was that no one was opposed to the arches in the building CM071294 Page 5 of 7