Gibbs Stat P1/Re-DR 941027DEVELOPMENT REVIEW COMMI
ENGINEERING COMMENTS
Gibbs Station, Phase One, Replot of Lots I through 13, Block E, located
south and east of the intersection of Beverly Drive and Creek Crossing,
at the request of Dowdey Anderson & Associates, Inc.
DRC DATE: October 27, 1994 and November 3, 1994
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 093-1016)
L
COMMENT STATUS: ,~ INITIAL ~ IzINAL
Replat Comments: 1. The emire floodplain note should be shown on the face of the plat.
2. The floodway should be shown across Lot 1-R.
3. There should be a note on the face of the plat clearly stating who will be maintaining
the floodway easement.