Loading...
Gibbs Stat P1/Re-DR 941027 (3)I'~ELECTRIC P~ Plat for Date Comments for the City of Coppell Development Review Committee lir. inary/~in~l ~ acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234