Loading...
Gibbs Stat P2/Re-DR 950323 (5) l/ TUELECTRIC Comments for the City of Coppell Development Review Committee Pr~l i~ ,,~~t for , Date 3-23-95 ~, p~in~,Fin~l_~is.~me acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234