Gibbs Stat P2/Re-DR 950323 (5) l/
TUELECTRIC
Comments for the City of Coppell
Development Review Committee
Pr~l i~ ,,~~t for ,
Date 3-23-95
~, p~in~,Fin~l_~is.~me acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234