Loading...
GTE/Re,MP,SPRv-DR 980730 City of Coppell Development Review Committee Comments Planning Department GTE Shared Services Center Addition, Replat and Minor Plat and Site Plan Review DRC Date: July 30, 1998 Planning & Zoning Commission Meeting: August 20, 1998 City Council Meeting: September 8, 1998 The City is making every effort it can to accommodate this project. However, without changing the zoning district staff cannot approve the site plan unconditionally as submitted, nor can the Planning and Zoning Commission, nor even the City Council, because it does not observe landscaping regulations. The only body with authority to vary a zoning regulation is the Board of Adjustment, as long as, due to special conditions, a literal enforcement of the ordinance would result in unnecessary hardship and substantial justice is done. While the applicant is entitled to appeal to the Board of Adjustment, it is difficult to imagine what special conditions there might be on a 23-acre site that is flat, has access on three sides, and is not overly irregular in shape, so as to cause unnecessary hardship for the construction of a building. Also, the Board would need to ask itself if the granting of a variance would result in substantial justice being done? In the eyes of GTE that answer may be a resounding "yes". However, in the eyes of Lucent Technologies, which has observed the City's landscaping regulations, the answer may not be so favorable. To keep the project on a fast track it may be prudent to revise the site plan to comply with landscaping regulations. On its revised landscape plan, staff requests that the applicant to provide the following landscaping information: a) Total Square Feet of Required Perimeter Landscaping: I) Off-street Parking adjacent to street r.o.w.: 15' buffer from edge of pavement. II) Off-Street Parking adjacent to all other property lines: 10' buffer from edge of pavement. b) Total Square Feet of Provided Non-Vehicular Area: Show square feet of landscaped area around the buildings, along SH 121 and along the lot line separating the two lots. c) Specify the type of special paving and decorative rocks being proposed at the two building entrances. d) Fumish elevations of trellis. e) A 30" high hedge or berm is required to screen the parking adjacent to eastern lot line of Lot 1. Also, the dwarf burford holly being proposed to be used to screen the cars along Corporate Park Blvd., SH 121 and Coppell Roads, must be 30" high at the time of planting. f) Show location of the monument signs on the Landscape Plan. g) The proposed landscape treatment along SH 121 does not follow the spirit of the recommendations of the Comprehensive Master Plan nor the CIVIC Report. Staff requests additional evergreen shrubs be planted along SH 121, as well as substituting the Sweetgum trees with Chinese Pistache or Live Oaks along SH 121. h) Correct parking space dimension to 9' x 19' or 9' x 17' with a 2 foot overhang. I) The City does not have a standard for loading docks for an office building. Based on standards used in other surrounding communities, we think 3 loading spaces should be required for 500,000 sfofoffice space. Specify building material and colors on building elevations and on monument sign elevation. Bring to the August 6th Development Review Committee meeting samples of all exterior building materials. Modify Site Tabulations on Site Plan to match information on the Replat and Minor Plat. Modify the following items on the Replat/Minor Plat: a) City Secretary's Signature block. (see attachment) b) Provide the floodplain administrator's signature block. (see attachment) c) The Denton/Dallas County Line is incorrectly shown. Delete it. d) Consolidate the TU Electric and Lone Star Gas Signature line as one. Note: A. B. Staff written comments will be faxed to each applicant. Please revise plats, landscape plans, and utility plans based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the August 6th Development Review Committee (DRC) meeting. Each applicant will bring one new set of revised plats and plans to the August 6th DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tuesday, August llth to resubmit eighteen (18) folded copies of revised plans and three (3) reduced paper copies (8 1/2 X 11) of each exhibit to the Planning Department. SUBDIVISION REGUL~kTIONS - CITY OF cOPPF~'.L, TEXA? SECTION XI - FILING OF PLAT The undersigned, the City~retary of the City of Coppell, Texas, hereby certifies that the foregoing._._ plat of the Subdivision or Addition to the City of Coppell was submitted to the City Council on the day of ,19 , and the Council, by formal action, then and there accepted the dedication of streets, alleys, parks, easements, public places, and water and sewer lines, as shown and set forth in and upon said plat, and said Council further authorized the Mayor to note the acceptance thereof by signing his na~e ~ hereinabove subscribed. Witness my hand this day of , A.D., 19 __ END OF SECTION Page 31 sections of this Article 5. Base flood (including design base flood) elevation data shall be generated for subdivision proposals and other proposed development including manufactured home parks and subdivisions if not otherwise provided. All subdivision proposals including manufactured home parks and subdivisions shall have adequate drainage provided to reduce exposure to flood hazards. All preliminary and final plat: subdivision proposals must have the following note placed on ~he Coppefl Floodplain "Floodplain Development Permit Application No. filed with the City of · Date. ' has been Administrator on , Floodplain Administrator, All subdivision proposals shall have the boundaries of the 100-year floodplain and floodway clearly shown on the preliminary and final plat. All lots within or adjacent to the 100-year floodplain shall have the lowesl floor elevation for each building site shown on the f~na! plat. When any part of a subdivision lies within or adjacent to the 10(byear floodplain, a permanent bench mark tied to a desi?nt,-d National Geodetic Vertical Datum marker shall be established within the subdiv~on at ~u accessible location The bench mark and tie shall be located and referenced with all pertinent information on the final plat along with a registered public surveyor's seal. When any part of a completed subdivision is within or adjacent to the year floodplain, the following note must be placed on the final plat: ~'ne developer, builder, seller, or agent shall inform in writing, each prospective buyer of subdivision lots or property located within special flood hazard areas of this site that such property is in an identified flood hazard area and that all development must conform to the provisions of the City of Coppell Floodplain Management Ordinance.' The written notice shall be filed for record in the county Deed of Records AC_sOo52~