Loading...
Heartz Road/PP-AG 890228 (4)sk~MIssION DEADLINE: 5:00 p.m. Honday - 8 Days Preceding City Council Meeting .. Rev.: Effective 1/20/88 REF/FILE NUMBER FOR CI. CO CIL mSC, ROAD II. ITEM CAPTION : TO~ locate~ mouth of Parkway III. ACTION P~¢OltiDIO~D . DATE OF ilr.- REP. B: OTHER- V. NOTIFICATION TO · VI. METHOD OF CONTACT : DATE : FINANCIAL REVIE~ : 1. BUDGETED ITEH 2. BUDGET ANOUNT 3. ESTIMATED AMOUNT FOR THIS ITEM 4. A~OUNT OVER OR UNDER BUDGET 5. LOW BIDDF. R RF. CONME~ NO NO¸ ,sq~c~ .OF Fmmuq~ CO'S OR BONDS (Series ~R APPROVED:BY AGEIqDA~REQUEST FORM DMEMOI SUPPORT DOCUMENTATION FOR AGENDA ITEM **************************************** * DATE RECEIVED * * TIME * * To be completed by City' Manager Dept,* **************************************** SUPPORT DOCUMENTATION SUBMITTED AMOUNT PER/SET MEMORANDUMS...... .......... · ~ ~ ...... :.: : - " . LETTERS ........................... : REPORTS ........................... : BILLS ............................. : BID ............................... : NO. OF PAGES DATE SUBMITTED MINUTES 2 .......................... -~" . -. ~. ORDINANCE ........... ....................... eeeeeee~ ee~eeeeee~ee~ ~S ZONING PLUS, .... PR~,~M~N~Y PLATS FIN~ PLATS ....................... SITE PLUS ........................ L~SCAPE PLUS ................... ~C~I~CT~ R~ERTNGS OT~ER ............................. REVIEWED BY (If applicable) SIGNATURE CITY ATTO1;LNEY ..................... : FINANCE DIRECTOR ....... .. .......... : OTHER ............................. : SUBMITTED BY SIGNA~JRE DATE REVIEWED DATE SUBMITTED DEPARTMENT ........................ : DEPARTMENT DIRECTOR ............... : APPROVED BY CITY MANAGER ...................... : DENIED BY CITY MANAGER ...................... : SIGNATURE AtChe request:( SUBMISSION DEADLINE: 5:00 p.m. Monday Rev.: Effective 1/20/88 - 8 Days Preceding City Council Meeting REF/FILE NUMBER AGENDA REQUEST FORM FOR C~TY COUNCIL ~SC: Fernery II. ITEM CAPTION lo~__t_~_ s~*h of l~r~wal : To cc~kl~ III. ACTION RECOMMENDED IV. REP. IN ATTENDANCE A: STAFF V. NOTIFICATION TO : B: OTHER - VI. METHOD OF CONTACT : DATE -- : FINANCIAL REVIEW : 1. BUDGETED ITEM 2. BUDGET AMOUNT ESTIMATED AHOUNT FOR Tills 4. AMOUNT OVER OR UNDER BUDGET 5. LOW BIDDER RECOMME1~DJgD SOURCE OP CO'S OR 'BONDS FUNDS - (Seriee or year au' OP~-RATZNC aU~OET (Ac¢oun~ OTHER NO NO AGENDA~EQUEST FORM DMEMOI APPROVED BY CITY ITEM NUMB~ CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Date: January 19, 1989 PLANNING DEPARTMENT RE: Heartz Road, Preliminary Plat LOCATION: South of Parkway Boulevard and north of Sandy Lake Road APPLICANT: ABQ Development Represented by Jerry Parche of Jerry Parche Engineers SUMMARY: Applicant is requesting approval of a preliminary plat and variances. ALTERNATIVES: 1) Approve the preliminary plat with variances. 2) Approve the preliminary plat. 3) Deny the preliminary plat. ATTACHEMNTS: 1) Plat 2) DRC Comments 3) Letter from Jay Chester 4) Partial copy of agreement between the City of Coppell and Univest. 5) Letter from Jerry Parche, P.E., Dated December 1, 1988 I{EART ZRD. STR Minutes of January 19, 1989 Planning and Zoning Commission Page 3 returned to the Commission by the City Council for reconsideration. Nathan Maier of Nathan Maier Engineers was present to represent this case before the Planning and Zoning Commission. · Following discussion, Commissioner Redford moved to approve the preliminary plat for Shadow Woods Estates with the requested variances. Commissioner Green seconded the motion; motion carried (4-0) with Commissioners Green, Johnson, Redford and Thomas voting in favor of the motion. Item 7: To consider approval of a preliminary plat for Heartz Road, located south of Parkway Boulevard, and north of Sandy Lake Road, at the request of ABQ Development. Russell Doyle introduced the item to the Commission. He stated that the applicant is requesting two (2) variances; (1) radius of the curb from 425 feet to 209 feet, and: (2) one-half right-of-way and roadway on the northern half near Sandy Lake Road. He further stated that any outstanding construction issues will be addressed during the final platting process. Jerry Parche, Consulting Engineer for ABQ Development, was present to represent this item and answer any questions. Following discussion Commissioner Redford moved to approve the preliminary plat for Heartz Road with variances. Commissioner Green seconded the motion; motion carried (4-0) with Commissioners Green, Johnson, Redford and Thomas voting in favor of the motion. Item 8: To consider approval of a final plat for Northlake Woodlands East #12, located at the northwest corner of Mockingbird Lane and the St. Louis and Southwestern Railroad, at the request of Don Tipton Engineering. Commissioner Thomas stated that the applicant has requested that this item be withdrawn and placed on the February, 1989, Planning and Zoning Agenda. He then called for a motion. Commissioner Green moved to deny the final plat for Northlake Woodlands East #12. Commissioner Redford seconded the motion; motion carried (4-0) with Commissioners Green, Johnson, Redford and Thomas voting in favor of the motion. Item 9: To consider approval of a final plat for Parkway Boulevard (West), located west of Denton Tap Road, at the request of ABQ Development. City Engineer Russell Doyle introduced the item to the Commission. GINN, INC. CONSULTING ENGINEERS January 4, 1989 Taryon Bowman City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Heartz Road Preliminary Plat DRC - Engineering Dear Taryon: We have reviewed the above referenced subject and offer the following comments. We have no objections to the variance request for a centerline radius of 209 feet based on our review of the plans and the items noted in their letter of December 1, 1988. The Water, Sewer and Drainage plans will be addressed during the construction plan review process and any issues resolved at the time of final plat submittal. Please call if you have any questions. Sincerely, Kevin Peiffe~2 P.E. cc: File 88305 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 ,XBlll)evelopment December 12, 1988 Ms. Taryon Bowman Planning and Zoning Coordinator City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Heartz Road Preliminary Plat ABQ Development Corporation 525 S,!~er SW S~te 200 PO 80, 25625 A ~uquer~ue NM87'25 Te 505 242 3330 Dear Ms. Bowman: Please find attached information regarding partial assignment of the City contract between Univest and ABQ. AS you know, the City of Coppell entered into a contract with The Parks of Coppell Joint Venture on December 30, 1982. When ABQ purchased the property from the Parks of Coppell Joint Venture II, a partial assignment of the above referenced City contract was executed. The documents are attached. In this City contract, more specifically Article 4 paragraph 2.d, there is allowance for the Heartz Road to be built with 24 foot of paving. This 24 foot width of paving shall be sufficient until such time as the final plat is filed of record for the property on the opposite side of the road. Therefore, it is the request of ABQ that the City of Coppell honor this City contract and allow for the Heartz Road preliminary Plat to proceed on through the approval process with the half section as it is proposed. ABQ understands the City's reluctance to approve half section streets and ABQ will do everything in their power to contact and convince the owner of the Ruth Perkins Tract to donate or dedicate the right-of-way required to complete the paving width of 'Heartz Road. ABQ will update the City of Coppell as to the progress of this effort. If you have any questions, please let me know. Sincerely, J~_A. Chester, P. · P~oject Manager Enclosures ARTICLE ?URCHAS~ A. ~unici~al Center Site. The pdrch&se price fur the Municipal Center Site shall De 'Three Hundred Thousand Two Hundred Ninety-Two and N:'iCC 5oiia~s ($36!,292.9~. The number of gross square fee: has ~een determined ~Y survev as ~rovided in 'r~ici= Vi ~v ~%-.. ~o C~ner en the Closinc Date, as hereinafter defined, i~ cash 9r by cashier's check ~avabie to tko order cf P..= . I. The purchase ~rice for B. 7~rk Site ~s: . ' cf ~ne Park Site shall ~e .~o Hundred Th:try-Three Thousand c~ven Hundred Fifty and No/100 Dollars ~e~ ~50.00) ~-- the - , .--=-~' ... acres · :sD. ox ....... iy :~ 34 designated Phase I on Exhibit "C" T~ purchase price for Phase i of the Park Site shall ke ~aid ~n := or .= cashier's check payable to the order of Owner. ARTICLE iV .... ~,-=a~ PRECEDENT TO OBLIGATIONS ~Y OWNER The obligation of Owner to consu=ate this Agreement ~ '', the option of Owner, be subject =o the following cond~!ons orecedent, any or all of which may be waived in wno!e or in Dar= by Owner in its sole discretion. It '= a:reed, nowe~er, that City shall perform any particular waived c~ndltion feliowing Closing upon Owner's request, any such item being a covenant which shall survive c~osing. !. The Zoning Plan shall be in full force and effec= on the Closing Date. 2. The City Council of the City shall continue a:ree ~hat the proper interpretation of the Sub-Division ~inance .~ respect to the Property shall allow for the Prooer~y to be developed as follows, it being agreed that such interpretation and the resulting application of the Sub-Tfvision Ordinance is the normal and reasonable course in light of all relevant circumstances: (s) No perimeter alleys shall be required ~etween deve!opmen%s in different zoning classifications; ih) Residential lots may front on Moore, Deforest, Lodge, Heartz, Sandy Lake and Denton Tap Roads and Parkway Boulevard, provided that rear access driveways are provided for such lots; {c) Moore, Deforest, Lodge and Heartz Roads and Parkway Boulevard shall have sixty foot '(60') rights-of-way with ferry-four foot (44') wide paving, provided that Parkway Boulevard shall be a divided thoroughfare fr~m Denton Tap Rea4 to H~eartz Road with two (24') pav~ng sections in seventy-four feet (74') e: {d) On Moore, Deforest, .H_gartz and Lodge Roads and Parkway Boulevard, pa~ing c~ only twenty-four {n4') in width shall be required uD~.$~_.}3~, time as a final %:de 'of S~ch Jerry Parchd Consulting Engineers December 1, 1988 Ms. Taryon Bowman Planning & Zoning Coordinator City of Coppell P O Box 478 Coppell, Texas 75019 214/462-0022 RE: JP No. 88009; Heartz Road Preliminary Plat; Coppell, Texas Dear Taryon: Enclosed are six prints of the Preliminary Plat of Heartz Road from Sandy Lake Road to Parkway Boulevard and two prints each of the Water and Sewer Plan, Drainage Plan, and the Conceptual Landscape Plan showing proposed facilities in the Heartz Road Right-of-Way. Also enclosed is a copy of a letter report to Mr. Jay Chester of ABQ Development Corporation dated November 17, 1988, giving the results of a study prepared by our firm of sanitary sewer facilities in the platted section of Heartz Road. An exhibit showing the sanitary sewer service area is attached with the aforementioned letter report. This letter and the enclosed drawings are submitted to the City in response to comments on the original submittal that were provided at the Development Review Committee meeting on October 25, 1988. Following is a summary of the major issues and our responses. 1. West half of the proposed Right-of-Way for 621 feet north of Sandy Lake Road. The centerline of Heartz Road north of Sandy Lake Road coincides with the east property line of the Town Center Site. Survey studies have determined that a strip of land of unknown ownership lies between the Parks of Coppell Joint Venture II property and the Ruth Perkins property north of Sandy Lake Road. This strip of land constitutes most of the remaining 30 feet of Right-of-Way required for Heartz Road in this area. The balance of the eastern half of the Right-of-Way between Sandy Lake ROad and the ABQ property must be obtained from the Perkins tract. 320 W'estway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817] 465-0259 Ms. Taryon Bowman JP No. 88009 December 1, 1988 Page 2 of 4 ABQ Development has requested the Coppell office of Ticor Title to research title to this strip of land north of Sandy Lake Road and to establish current ownership of the Perkins tract. A copy of the letter report received from Ticor Title is attached to this letter. ABQ Development and the Parks of Coppell Joint Venture II (PCJV II) have committed financial resources to construct Heartz Road where the proposed roadway is located on their respective properties. Since only one-half of the roadway Right-of-Way is located within the ownership of either PCJV II or ABQ for 621 feet north of Sandy Lake Road, and since no legal authorization has been secured to construct any improvements outside of the limits of PCJV II or ABQ property, a variance to construct only the west half of Heartz Road is requested in this area. ABQ and PCJV II will provide sanitary sewer, water and storm drainage facilities in the proposed half street section. In addition, if either the property owner or the City of Coppell will agree to pay for construction of the west half of the roadway adjacent to the Perkins tract, ABQ will provide engineering to design the full roadway section in this area. 2. 209 feet centerline radius south of Parkway Boulevard Development Review Committee comments indicate that the Subdivision Ordinance requires a minimum radius of 425 feet for any street within the City. This minimum radius is based on a design speed of 30 m.p.h. Many streets, however, have centerlines with a radius considerably less than 425 feet. A variance is requested to permit a 209 foot centerline radius in Heartz Road south of Parkway Boulevard in order that the roadway centerline may coincide with the property line between the PCJV Ii and ABQ properties. Technical justification for this r~quest is based on the location of the radius in question and traffic flow in the proposed intersection. Ail traffic on proposed Heartz Road just south of Parkway Boulevard will be in a "Stopping" or "Accelerating Condition". No through traffic will occur since Heartz Road will not be continued north of Parkway Boulevard. Therefore vehicle speed in the proposed 209 foot radius curve should be substantially Ms. Taryon Bowman JP No. 88009 December 1, 1988 Page 3 of 4 less than the design speed typically used for collector or even local streets since the location of this curve is at an intersection where traffic is required to come to a complete stop or execute a 90 degree turn upon entering or leaving the 209 foot radius curve. 3. Sanitary Sewer Capacity We have prepared an analysis of the sanitary sewer facilities in Heartz Road north of Sandy Lake Road in the Right-of-Way being platted. A copy of our letter report and exhibit showing the sanitary sewer service area is enclosed. The results of our study indicate that the capacity of the existing eight-inch sanitary sewer from approximately 1000 feet north of Sandy Lake Road to Parkway Boulevard is deficient with a fully developed service area. We have sized a parallel sewer pipe for this area such that the total capacity of both pipes exceeds the design loadings. Conceptual design of the parallel sanitary sewer facilities has been added to the Water and Sanitary Sewer Plan enclosed. Please review this study and advise us whether the parallel sewer facilities are acceptable as shown so that we may proceed with the final design. 4. Water Main Twelve-inch valves have been added to the proposed water main at 600 feet intervals. Five hydrants have also been added at 300 foot maximum spacing. Compliance with other comments regarding required easements, construction details, brick pavers at Parkway Boulevard , etc. will be addressed in preparation of the Final Plat and construction plans. Analysis of the linear park channel will also be addressed in the design phase. I trust that the information presented herein satisfys the concerns of the Development Review Committee and will permit the Preliminary Plat approval process to proceed. It is our understanding that this Preliminary Plat will be on the Planning & Zoning Commission agenda on December 15, 1988. Ms. Taryon Bowman JP No. 88009 December 1, 1988 Page 4 of 4 If you need any additional information, please call. Thank you. Sincerely,~  erry Parche' , P.E. JP:ch Enclosures: Six copies of Heartz Road-Preliminary Plat As Revised Two copies Water and Sanitary Sewer Plan As Revised Two copies Drainage Plan As Revised Two Copies Conceptual LandsCape Plan As Revised Copy of Sanitary Sewer Report & Exhibit Dated November 17, 1988 Copy of Letter from Ticor Tittle Dated November 8, 1988 w/attachments cc: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Mike Allen/Parks of Coppell Joint Venture II w/encl. CITY OF COPPELL ESCROW AGREEI~NT For and in consideration of the mutual covenants and agreements herein contained, the City of Coppell hereinafter called "City" and ABQ Development hereinafter called "Developer", do hereby agree as follows, to-wit: WHEREAS, the current City policies (Subdivision Ordinance Appendix A, Section 17) require that in new areas, a Developer install major public improvements where required in or adjacent to said addition. Developer has elected to develop Parkway Boulevard (West),an Addition in the City of Coppell, Dallas County, Texas. In lieu of the developers obligation to construct their portion of the extension of a 16" water main across Denton Tap Road (see exhibit A), Developer agrees to place in escrow $15,782.25 for the construction of aforesaid major public improvements. This dollar amount being based on the current pro rata charges as provided for in Appendix B of the Sub-Division Ordinance, and determined by the attached bid tabulation. THEREFORE, the Developer does hereby deposit $15,782.25, which will be held in the sole name of the City in an interest bearing account to draw interest at the current rate. No withdrawals shall be made until such time as the above mentioned improvements are made. After completion and acceptance of the above mentioned improvements by the City, the difference between the escrowed funds (original amount escrowed plus accrued interest) and the actual cost shall be refunded to the Developer. In the event that actual cost of above mentioned improvements exceed the -scrowed funds (original amount escrowed plus accrued interest) the Developer will be assessed the difference. Payable within ten (10) days of notice. THE CITY may issue BUilding Permits on the aforesaid property without the requirement of the aforementioned improvements, and upon deposit of Escrow Funds described herein. Signed and 19 Executed this the day of Developer Mayor Attest: City Secretary ESCRWAGR.001