Heartz Road/PP-CS 881212 %BODevelopment
December 12, 1988
Ms. Taryon Bowman
Planning and Zoning Coordinator
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75019
RE:
Heartz Road Preliminary Plat
ABQ Development Corporation
625 Silver SW
Suite 200
PO Box 25625
Albuquerque, NM87125
Tel 505 242 3330
Dear Ms. Bowman:
Please find attached information regarding partial assignment of the
city contract between Univest and ABQ. As you know, the City of Coppell
entered into a contract with The Parks of Coppell Joint Venture on
December 30, 1982. When ABQ purchased the property from the Parks of
Coppell Joint Venture II, a partial assignment of the above referenced
City contract was executed. The documents are attached.
In this City contract, more specifically Article 4 paragraph 2.d,
there is allowance for the Heartz Road to be built with 24 foot of
paving. This 24 foot width of paving shall be sufficient until such
time as the final plat is filed of record for the property on the
opposite side of the road. Therefore, it is the request of ABQ that the
City of Coppell honor this City contract and allow for the Heartz Road
preliminary Plat to proceed on through the approval process with the
half section as it is proposed.
ABQ understands the City's reluctance to approve half section streets
and ABQ will do everything in their power to contact and convince the
owner of the Ruth Perkins Tract to donate or dedicate the right-of-way
required to complete the paving width of Heartz Road.
ABQ will update the City of Coppell as to the progress of this effort.
If you have any questions, please let me know.
Sincerely,
~~oj~ect Manager
Enclosures