Gulf United/PP-CS 941219December 19, 1994
Gulf Bearing, Inc.
501 Industrial Boulevard
Grapevine, TX 76051
RE: Gulf United Industries Addition, Preliminary Plat
Dear Sirs:
This letter is to inform you that your request for approval of Gulf United Industries Addition,
Preliminary Plat, located at the northwest corner of Royal Lane and Bethel Road, was approved
by the Coppell Planning and Zoning Commission on Thursday, December 15, 1994. The
following conditions apply:
2.
3.
4.
5.
6.
o
Typical utility easements will be needed;
landscape plans will require seals and quantity breakdown;
a fire lane will be required through the south parking lot;
the building will be sprinklered;
typical fire hydrant locations must be met;
landscaped setbacks (10 feet) with 3' high screening is required along the west
property line where parking is shown;
common driveway easement, drainage system/easement, and additional 5'
easement along Royal Lane need to be shown on the face of the Plat; and
escrow will be required for Bethel Road.
The date scheduled for consideration by the Coppell City Council is Tuesday, January 10, 1995,
at 7:30 p.m. A representative for this case must be present at this meeting. Failure to represent
this item may result in the denial of this application.
Sincerely,
(.L' ' ., .)P"'"~ ~'-~ '~'{ "~" /
Director of Planning & Community Services
bhj
xc: Gromatsky, Dupree, architect
Brockett, Davis Engineers
Isabelle Moro, Acting P&Z Coordinator
Building Inspection