Heartz Road/FP-CS 901008October 8, 1990
Mr. Michael R. Allen
Univest Development Company
12770 Colt Road, Suite 1215
Dallas, Texas 75251
RE: CONSTRUCTION OF ROAD AND UTILITY IMPROVEMENTS
PARK PLACE ADDITION AND REARTZ ROAD
Dear Mr. Allen:
At your request, I am addressing this letter to expand on the following
items covered in my letter to you of October 5, 1990. The following
statements are numbered according to the paragraph numbers to which they
refer in the October 5th letter:
2. It is the intent of this paragraph to confirm that the Park Place
Addition is exempt from the Roadway Assessment specified in the
October 4th memorandum on City fees attached to the October 5th
letter, based on the contractual provision as conveyed by our legal
consul.
3.~,The intent of this paragraph is to confirm that public works ha~
/,,,-reviewed and approved the engineering plans for providing sewer ana
,," drainage services to Park Place. In fact, these plans were approved
Friday afternoon, October 5, shortly after my letter was picked up by
your representative.
4. The review of the Dowdey/Heartz Plans has now been completed and
those plans are approved by the Cityo --~ thJ. C2.-.~ ~v~ ~ .... ~
The City shall be the only goverru~ental inspection agency for the
construction of the facilities on the Dowdey/Heartz Plans, provided
however that the CMUD will also inspect the connection of the new
Heartz sewer line to the CM~D trunk sewer line.
6. The reference in this paragraph in the October 5th letter, "subject
to certain conditions," was intended to refer to only the need to
finally determine the appropriate spacing between the poles to be
used for street light standards. I would add here that we are now
looking at more extensive use of underground utilities and the
eventual elimination of multi-use power poles.
7. With respect to the use of the Mutual Drainage Easement for storm
drainage discharge for Heartz Roa~and Park Place, there are no
other known City requirements~-~ this time for the use of that
channel other than those specified in previous correspondence or in
the Dowdey/Heartz Plans.
October 4th Memorandum - Park Fees - With respect to the 50% due from
builders, these fees are collected as each separate building permit
is issued.
October 4th Memorandum - Street Sign Assessment and Street Light
Assessment - these fees include both Heart~. Road and the Park Place
Addition. Prior to payment, the separ$~e .a~.oun.~s for each wi.ll
The above statements are intended to update and expand upon my letter to
you of October 5, 1990. Please let me know if you have any questions.
Yours truly,
Alan D. Ratliff
City Manager
ADR/GLS/lsg
MALLEN
COPP~?.?. PUBLIC WORKS
DATE:
TO:
FROM~
REs
October 4, 1990
File
Public Works Staff
Construction Fees for Heartz Road - North of Sandy Lake
Construction Permit Fees
- $600,000 Construction cost x 2% = $12,000.00
100% Due at time of pre-construction conference.
~treet Light Assessment
- $292.60 per light for every 200 feet of roadway.
You are being assessed for 2858 feet of roadway, which totals
to 14 lights.
- $292.60 x 14 lights = $4,096.40
100% Due prior to acceptance of Street Construction
Street Sign Assessment
SIGN UNIT PRICE
OUANTITY
EXTENDED PRICE
No Parking $53.10 0 $ -
Speed Limit 63.54 2 127.08
Yield 58.56 0 -
Stop 65.12 0 -
Street Name 11.60 0 -
Stop & Street Combo 96.85 2 193.70
Total $320.78
100% Due prior to acceptance of Street Construction.
cc:
Frank Trando, Finance Director
Larry Davis, Public Works Inspector