Loading...
Heartz Road/FP-CS 901005P.O. Box 478 CoppelI, Texas 75019 214-462-0022 October 5, 1990 Mr. Mike Allen Univest Development Company 12770 Coit Road, Suite 1215 Dallas, Texas 75251 RE: PARK PLACE AND HEARTZ ROAD IMPROVEMENTS Dear Mr. Allen: Based on a series of telephone calls beginning on Wednesday, September 26, and continuing on Friday, September 28, Tuesday, October 2, 1990, and including additional conversations with Gary Sieb, Steve Goram, Howard Pafford and others, I have included below a point-by-point discussion of issues you brought up in your August 27 and 31 correspondence to the City. You have also received a letter from me dated September 20, which included erroneous fee information which was discussed in a Septealber 28 telephone call with Gary Sieb. Mr. Sieb apologized for that inaccurate fee data and your September 20 letter to us reflects the correct fees. Now to address your earlier correspondence of August 27, 1990, beginning with page 3: 1. The preliminary/final plat for Park Place, and the final plat approval of Heartz Road are valid. Necessary signatures from A BQFSB will be required before the Heartz Road plat can be filed for record. I understand that plat has now been filed. 2. Our legal counsel advises .us that the original agreement between Parks of Coppell Joint Venture II and the City (Article 4, paragraph 2E of that agreement) requires dedication, does not require assessments for improvements. 3. (Your second 2) Public Works reviewed your engineering plans for providing sewer and drainage services to Park Place. The attached Public Works memo dated October 4, outlines fee obligations. 4. (Your 3) As you are aware, Dowdey/Heartz Road plans are under review and will be completed this afternoon. The M.U.D. has requested to review construction plans as they relate to where the Park Place development connects to the proposed new sanitary sewer line to be constructed in Heartz Road, and where the new connection will be made into the M.U.D. system. 5. (Your 4) As clarified by Council, the prevailing water and sewer impact fees will be assessed and the water impact fees will be collected at the appropriate time. Sewer impact fees will not be collected until an impact fees agreement has been initiated between the City and MUD. These fees are being collected on all plats which did not have final plat approval prior to June 15, 1990. I believe this issue was resolved by your September 20 correspondence, also. 6. (Your 5) The City will allow electric distribution line poles along Heartz to be used for suspending street lighting, subject to certain conditions. 7. (Your 6) The mutual drainage easement may be used to provide storm drainage discharge points for Heartz Road provided grades, geometries and other City requirements are followed. 8. (Your 7) Our normal 12 month work guarantee on the developer improvements will be required here, as is the case generally. Depending upon comments generated in our engineering review, the City would typically require only those construction elements outlined in your number 7 paragraph. Regarding your August 31 correspondence, the final plat was approved based, in part, on engineering drawings for streets showing the slope conditions you requested. I believe this addresses all the concerns outlined in your earlier correspondence to the City, as well as the issues discussed by telephone. If I might elaborate on any of these issues or refer you to the appropriate technical resource personnel, please contact me at your convenience. ~Y~.urs truly, Alan D. [atliff City Manager / ADR/GLS/lsg Attachment xc: Gary L. Sieb, Director of Planning & Community Services Steve Goram, Director of Public Works MA2 COPPE?.?. PUBLIC WORKS DATE = TO~ FROM= RE= October 4, 1990 File Public Works Staff Developmental Fees - Park Place Addition Water/Sewer Impact Fees Water Impact 88 Lots @ $660.00 each 100% Due prior to Council approval of final plat. Wastewater Impact 88 Lots @ $422.00 each This fee will not be collected until an interlocal agreement is adopted between the Coppell MUD #1 and the City. Water Tap Fee (Inspection) 88 Lots @ $100.00 each 100% Due at time of Building Permit. Sewer Tap Fee (Inspection) 88 Lots @ $100.00 each 100% Due at time of Building Permit. $58,080.00 $37,136.00 $ 8,800.00 $ 8,800.00 Park Fees Park Place Addition 88 Lots @ $150.00 each 50% Due prior to Council approval of final plat by developer. 50% Due prior to building permits being issued by builder(s). $13,200.00 Street Sign Assessment SIGN UNIT PRICE 0UANTITY EXTENDED PRICE' No Parking $53.10 0 $ - Speed Limit 63.54 19 1207.26 Yield 58.56 0 - Stop 65.12 0 - Street Name 11.60 0 - Stop & Street Combo 96.85 8 774.80 Total $1982.06 100% Due prior to acceptance of subdivision. Street Light Assess~ent $292.60 per light for every 200 feet of roadway. You are being assessed for 5377 ft. of roadway, which totals to 26 lights. $292.60 x 26 lights = $7,607.60 100% Due prior to acceptance of subdivision. Roadway Assessment The above referenced subdivision fronts Sandy Lake Road for the length of 678.32 feet. Approximate cost of a four lane divided road in a six lane R.O.W. for this project is: 678.32 F.F. x $170.40 (Per F.F.) - $115,585.73 100% Due prior to final acceptance of infrastructure.~ i~.~ ~'~ 74!%1%~-.~,'~>~ Construction Permit Fee $730,725 project cost x 2% = $14,614.50 100% Due at time of pre-construction conference. the subdivision cc: Frank Trando, Finance Director Gary Sieb, Planning and Zoning Dale Jackson, Building Inspections