Loading...
Gunner Sub/PP-CS 970910RO. Box 478 Coppell. Texas 75019 972-462-0022 September 10, 1997 WHRB Real Estate L.P. 4801 Woodway, Suite 102W Houston, TX 77056 RE: Gunner Subdivision, Lots l&2, Block A, Preliminary Plat Dear Madam/Sir: This letter is to inform you that the Gunner Subdivision, Lots l&2, Block A, Preliminary Plat, to permit construction of a 600-unit apartment complex to be undertaken in two phases on separate tracts of land totaling 37.77 acres of property located on the south side of Beltline Road, approximately 2,100 feet east of MacArthur Boulevard was approved by the Coppell City Council on Tuesday, September 9, 1997, subject Engineering comments (attached) and the following condition: Accommodation of a Hike and Bike Trail to provide a pedestrian link between the Riverchase development and nearby school facilities. For your information, Council did not grant the Planning and Zoning Commission Final Plat authority. Consequently, your Final Plat submittal will need to be approved by both the Commission and Council. If you have any questions, please contact me at (972) 304-3675. Community Services Carlson-Salcedo-McWilliams Isabelle Moro, AICP, P&Z Coordinator Building Inspection ENGINEERING COMMENT ITEM: Gunner S~n, Lots 1-2, Block A, Prelia ~mzrv Prat, to construct~n of a 600 unit apartment development to oe in two phases on sepm~e tracts of land totaling 37. 77 acres of property, located on the south side of Beltline Road, approximately 2,100 feet of MacArthur Boulevard, at the request of Carson- Salcedo-Mc~, Inc. DRC DATE: July 31, 1997 and August 7, 1997 CONTACT: Mike Martin, P.E., Assistant City Engineer 004-3679) COMMENT STATUS: PP. ELIMINAP. Y FTM., ,, ~.~ · ~REVISED AftER Preliminary Plat 1. Provide utility easement for meter vaults. Informational Comments 2. Permission must be provided from the Trinity River Authority (TRA) to connect to their sanitary sewer line. 3. There needs to be discussion about participation in the cost of the proposed traffic light at Fairway Drive. 4. Provide conduit and traffic pull boxes at driveway for possible future traffic signal. Site Plan 5. Show the correct sight visibility triangles at entrance driveway.