Loading...
Gunner Sub/PP-DR 970731 (4) IIELECTRIC 1997 Comments for the City of Coppell Development Review Committee Date Preliminary/~Plat for __~?~./,L//~///~,~_ V/Preliminary/~i~a~t-Plat is~m~t acceptable. V/Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. ~/ Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments / Please call me at ~4-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234